
●
The cabinet maybe installed through the wall in
both existing buildings and new construction.
●
The side louvers must project on the outdoor
side of the wall.
●
The room side of the cabinet must project into
the room at least
the finished wall.
The cabinet must be installed level from side to
side and with a 3/8” tilt from front to rear.
I
See page 8.
(obtain
●
2 wood screws, 1“ long
●
10 #10 wood screws, 1“ long
●
1 tube high grade caulking compound
●
Lintel, if required, to
bricks or blocks
above opening.
WALL OPENING
Determine size of opening. Measure width
and height of cabinet and add 1/8” to each
dimension.
2. Choose the wall opening location. Be sure
wall receptacle is (or will be) installed nearby.
3. Make the opening. Frame it to support the
weight of the air conditioner. Add metal flashing
over bottom of frame opening and 1“ upon sides
to reduce the possibility of condensate entering
the area between the inner and outer wall.
2.
Remove chassis from cabinet.
2. With caulking compound or electrical tape,
seal 10 holes provided in cabinet for top rail
and side retainers not used in this installation.
3.
WALL.
1.
Place the cabinet into the wall opening with
the bottom rail resting firmly on the bottom
of the wood frame.
2. Secure bottom rail to wood frame with two
1“ long wood screws obtained locally.
3. Secure cabinet to wooden frame with ten #10
1“ long screws or nails obtained locally. If frame
is oversize, use shims to eliminate distortion.
m
----- -
I ---
t
-------- , ,
------
12