
Contents
0-14
Issue 2 (12/2013)
USM 36
PRF MODE (pulse repetition frequency) 5-16
(function group RECEIVER). . . . . . . . . 5-18
FREQUENCY . . . . . . . . . . . . . . . . . . . . . 5-18
RECTIFY. . . . . . . . . . . . . . . . . . . . . . . . . 5-19
DUAL (pulser-receiver separation) . . . . . 5-19
REJECT . . . . . . . . . . . . . . . . . . . . . . . . . 5-20
and GATE B) . . . . . . . . . . . . . . . . . . . . . 5-21
Tasks of the gates. . . . . . . . . . . . . . . . . . 5-21
A-START/B-START
(starting point of the gate) . . . . . . . . . . . . 5-22
A-WIDTH/B-WIDTH
(width of the gates) . . . . . . . . . . . . . . . . . 5-22
A-THRESHOLD/B-THRESHOLD
threshold of the gate) . . . . . . . . . . . . . . . 5-23
TOF MODE . . . . . . . . . . . . . . . . . . . . . . . 5-24
Starting point of gate B . . . . . . . . . . . . . . 5-26
Automatic gate height . . . . . . . . . . . . . . . 5-27
5.8 Calibrating the USM 36 . . . . . . . . . . . . . 5-28
Calibrating the display range. . . . . . . . . . 5-28
Choice of the measuring point . . . . . . . . 5-28
Calibration with straight-beam and
angle-beam probes . . . . . . . . . . . . . . . . . 5-29
Calibration using dual-element probes . . 5-33
5.9 Making measurements . . . . . . . . . . . . . 5-36
General notes . . . . . . . . . . . . . . . . . . . . . 5-36
5.10 dB-difference measurement
(function group dB REF) . . . . . . . . . . . 5-37
Recording a reference echo . . . . . . . . . . 5-38
Deleting a reference echo . . . . . . . . . . . . 5-38
Echo height comparison . . . . . . . . . . . . . 5-39
(function group AWS D1.1) . . . . . . . . . 5-40
AWS D1.1 . . . . . . . . . . . . . . . . . . . . . . . . 5-41
5.12 Flaw position calculation with
Summary of Contents for 37 400
Page 1: ...USM 36 Technical Reference and Operating Manual ...
Page 5: ...USM 36 Issue 2 12 2013 0 5 Second operating level ...
Page 6: ...0 6 Issue 2 12 2013 USM 36 Second operating level continued ...
Page 10: ...0 10 Issue 2 12 2013 USM 36 ...
Page 20: ...0 20 Issue 2 12 2013 USM 36 ...
Page 21: ...USM 36 Issue 2 12 2013 1 1 Introduction 1 ...
Page 35: ...USM 36 Issue 2 12 2013 2 1 Standard package and accessories 2 ...
Page 40: ...2 Standard package and accessories Recommended accessories 2 6 Issue 2 12 2013 USM 36 ...
Page 41: ...USM 36 Issue 2 12 2013 3 1 Initial start up 3 ...
Page 53: ...USM 36 Issue 2 12 2013 4 1 Principles of operation 4 ...
Page 76: ...4 24 Issue 2 12 2013 USM 36 ...
Page 77: ...USM 36 Issue 2 12 2013 5 1 Operation 5 ...
Page 212: ...5 136 Issue 2 12 2013 USM 36 ...
Page 213: ...USM 36 Issue 2 12 2013 6 1 Documentation 6 ...
Page 242: ...6 30 Issue 2 12 2013 USM 36 ...
Page 243: ...USM 36 Issue 2 12 2013 7 1 Maintenance and care 7 ...
Page 249: ...USM 36 Issue 2 12 2013 8 1 Interfaces and Peripherals 8 ...
Page 253: ...USM 36 Issue 2 12 2013 9 1 Appendix 9 ...
Page 268: ...9 16 Issue 2 12 2013 USM 36 9 4 Recycling directives Overview 5 4 4 5 6 1 7 3 2 3 ...
Page 273: ...Recycling directives 9 Appendix USM 36 Issue 2 12 2013 9 21 6 6 6 ...
Page 274: ...9 Appendix Recycling directives 9 22 Issue 2 12 2013 USM 36 7 7 8 6 8 ...
Page 279: ...USM 36 Issue 2 12 2013 10 1 Specifications 10 ...
Page 289: ...USM 36 Issue 2 12 2013 11 1 Index 11 ...
Page 305: ...11 Index USM 36 Issue 2 12 2013 11 17 Z Zoom 4 3 ...