78
350 FEEDER PROTECTION SYSTEM – QUICKSTART GUIDE
SOFTWARE SETUP
CHAPTER 3: INTERFACES
8.
Enter the IP address, slave address, and Modbus port values assigned to the 350 relay
(from the S1 RELAY SETUP > COMMUNICATIONS > ETHERNET menu).
9.
Click the
Read Order Code
button to connect to the 350 and upload the order code. If
a communications error occurs, ensure that the Ethernet communication values
correspond to the relay setting values.
10. Click
OK
when the relay order code has been received. The new device will be added
to the Site List window (or Online window) located in the top left corner of the main
EnerVista 3 Series Setup window.
The 350 Site Device has now been configured for Ethernet communications. Proceed to
the following section to begin communications.
Connecting to the
relay
Now that the communications parameters have been properly configured, the user can
easily communicate with the relay.
1.
Expand the Site list by double clicking on the site name or clicking on the «
+
» box to
list the available devices for the given site.
2.
Desired device trees can be expanded by clicking the «
+
» box. The following list of
headers is shown for each device:
Device Definition
Actual Values
Quick Setup
Setpoints
Maintenance.
3.
Expand the SETTINGS > RELAY SETUP list item and double click on
Front Panel
to open
the Front Panel settings window as shown: