background image

PLACEMENT

Environment is to be clean, dry, and indoors. Unit is to remain above floor (rack and 4 wheel  casters are provided).  The Easy Series is 

designed to fit under a counter as a corner unit or next to an existing under counter item. The Easy Series System should be located 

in a climate controlled 

environment

 where it is protected from extreme hot or cold temperatures. The Easy Series System has been 

designed with a compact 18” x 24” footprint and 29.5” height, for under the counter placement. The System must be easily accessed 

for monitoring and service. Service area must permit access to all of the filter housings for removal and replacement of elements or 

cartridges.  

INSTALLATION NOTES

1.  Lines to POU: espresso machines, coffee brewers, water tower, and ice machine lines are owner plumbed. 

Lines to Points Of Use 

(POU) are to be Owner-Plumbed. Never include toilets, sinks, or dipper well. 

2.  Owner supplied shut off ball valves at city feed, Easy Series out, filtered water out, and bypass as shown in typical shut off detail. 

Pipe and valve size must match site requirements.

3.  Owner to provide G.F.C.I electrical outlet.
4.  The drain line must be attached and installed according to local city code. Usually with an air gap that has an unobstructed 

vertical distance through free atmosphere between the lowest opening from any pipe, plumbing fixture, appliance or other piece 

of equipment conveying waste to the flood level rim of the receptor. The vertical distance between the conveyor and receptor 

shall be no less than 1 inch.

5.  Installation must comply with existing local plumbing codes. Air gaps must comply with drawings or an approved air gap device 

may be used. In addition some local plumbing codes require back flow devices. Both the air gap device and back flow device are 

not supplied as part of the unit. These devices are available through your standard plumbing supply house.

 

*Alternate Bypass: If preferred, owner/installer is to provide plumbing of ball valve (shut-off-bypass) on wall as pictured    

above.  Points of use may be pre-plumbed as a single line through wall with manifold afterward.
6.  RO equipment must not be plumbed to dipper well, toilets or wash sinks. They are to be on city water only.
7.  OPC to provide plumbing configuration for RO: 3/4” pipe to 1/2” FIP threaded copper fitting on two (2) shut-off ball valves with 

by-pass ball valve. 

8.  OPC to provide plumbing configuration for Drain w/ 1/2” FIP fitting. Drain into indirect waste .
9.  Installer to provide 110 vac 15 amp GFCI plug for RO/Softener Systems.

10.  A  20” x 48” (508mm x 1219mm) equipment stand is supplied with unit. Allow clearance indicated in drawing for rough plumbing 

layout.

INSTALLATION PRECAUTIONS
• 

The Easy 360/720 System must be installed with the inlets/outlets/drain as shown. Do not to reverse connections.

•  Do not install on hot water line.  
• 

Maximum temperature allowed is 80°F (38°C).

• 

A pressure regulator is required on incoming water pressure over 75 psi.

• 

Use Teflon tape for connections. Do not use wicking or sealer for fitting connections.

• 

Do not use torch or other high temperature sources near filter, cartridges, or any plastic fittings and pipes.

• 

Installation must comply with existing local plumbing codes.

• 

Do not install in direct sunlight.

• 

Protect from freezing.  Do not install in area that will drop to 32°F (0°C) or  below.

• 

Allow minimum service clearance space as shown in layouts to facilitate routine maintenance.

• 

Mount System in a position and location so as to prevent system from being struck by items.

Lines to Points Of Use (POU) are to be owner plumbed. Never include toilets, sinks, or dipper well. Never hook RO up to hot water. 

Installation

Easy AB Formulator - Unit Guide

 

     

Page 4

Summary of Contents for Easy Series

Page 1: ...info gcwater com 20 Opportunity Road Camdenton MO 65020 805 484 1589 www GlobalCustomizedWater com Easy AB Formulator Reverse Osmosis and Remineralization Unit Guide...

Page 2: ...R P O S ES W I T H O U T S P EC I F I C W R I T T E N P E R M I S S I O N F RO M G LO BA L C U STO M I Z E D WAT E R Table of Contents Troubleshooting Guide Routine System Check Guide Production Rate...

Page 3: ...footprint as many Global Reverse Osmosis RO systems a Global standard known to many industries OPERATING PARAMETERS Open Flow Rate 4 5 GPM 17 034 LPM Service Flow Rate 3 GPM 1 4 LPM Storage Tank Capac...

Page 4: ...th the air gap device and back flow device are not supplied as part of the unit These devices are available through your standard plumbing supply house Alternate Bypass If preferred owner installer is...

Page 5: ...R CITY WATER Easy Series AB Formulator from Global shown above FROM MANIFOLD TO ICE MACHINE TO ESPRESSO BREWER WALL WALL Back Flow Device TO Water Heater TO ICE MACHINE SOFT HARD WATER TO ESPRESSO BRE...

Page 6: ...In Casters D AB Formula Caps with Siphon Tubes E 3 8 Blue Tubing F Elbow Connectors G Espresso Connectors 35 ft of 3 8 Tubing provided D J AB Formulator on Metro Rack K Tube Cutter J C E F H I K List...

Page 7: ...e ties under two bars on the metro rack around the manifold and through the zip tie locking device The manifold can be attached on the left or the right of the system Use tube cutter to trim the exces...

Page 8: ...g up the notches 7 Now the system is ready for you to turn on the water to the system Open the city feed to system Double check the A B Formula box connections It will take about 20 30 minutes to fill...

Page 9: ...up System pressure gauge should go up to 60 psi 12 Verify that there are no leaks Filter change is now complete Emergency Bypass In some emergency situations it will be necessary to put the unit into...

Page 10: ...Turn yellow lever on top not front of Easy System from normal mode to test mode Note water should immediately start to flow out of black 1 4 tube 4 Place the black tube into the 500 ml graduated cyli...

Page 11: ...o bypass Emergency situations which require putting the bypass handle into the bypass position turning the bypass handle yellow handle to point towards the word bypass are 1 System pressure gauge read...

Page 12: ...brew coffee during troubleshooting procedures equipment damage may result Y STEP INSTRUCTIONS Step 1 Step 1 Check the system pressure gauge reading If the pressure reading is normal 35 60 psi then the...

Page 13: ...System Service Log Record DATE PRE FILTER POST FILTER MEMBRANE CLEANING OTHER TECH NAME START UP START UP TDS INCOMING DATE BY PPM PSI Easy AB Formulator Unit Guide Page 13...

Page 14: ...s recommendations and applicable state and local codes The Global Customized Water Limited Warranty extends to the original purchaser of the system This warranty covers all parts and factory labor nee...

Page 15: ...accompanies the system Neglect improper maintenance abuse or unapproved modifications may invalidate the Warranty Should your unit develop a defect or otherwise fail to perform in accordance with this...

Reviews: