![GBD KUDA 150 Instructions For Installations Download Page 32](http://html2.mh-extra.com/html/gbd/kuda-150/kuda-150_instructions-for-installations_3833829032.webp)
PC200
10 - DIP SWITCH SW2
DIP 5
Description
DIP
Status
Function
WATER HAMMER
Disables the water hammer function.
Enables the water hammer function during opening to help electric lock release.
Operation:
at the START command, the following will occur in sequence:
- electric lock activation;
- closing pulse of
1 sec
;
- opening;
- electric lock release after
2 sec
.
ON
OFF
DIP 6
Deceleration speed equal to
50%
of the maximum speed.
ON
DECELERATION
SPEED
OFF
Deceleration speed equal to
70%
of the maximum speed.
DIP 7
ON
MOVEMENT
SPEED
OFF
Speed during normal movement equal to
100%
of the maximum speed.
Speed during normal movement equal to
70%
of the maximum speed.
DIP 8
ON
NUMBER OF
MOTORS
OFF
System configured for 2 motors.
System configured for 1 motor.
11 - TERMINALS 20 and 23 OPERATING MODE
GATE CLOSED
GATE OPEN
DURING CLOSING
DURING OPENING
GATE STATUS
EFFECT
PHOTOCELL 1
-
-
RELOADS THE PAUSE TIME
OPENS
GATE CLOSED
GATE OPEN
DURING CLOSING
DURING OPENING
GATE STATUS
EFFECT
PHOTOCELL 2
-
STOPS UNTIL RELEASE, THEN OPENS
RELOADS THE PAUSE TIME
OPENS
16
UK