![GBD KUDA 150 Instructions For Installations Download Page 31](http://html2.mh-extra.com/html/gbd/kuda-150/kuda-150_instructions-for-installations_3833829031.webp)
PC200
8 - DIP SWITCH SW1
ON
STEP-BY-STEP
WITH STOP
OFF
CONDOMINIUM
Operation in response to the START command:
Gate closed
OPENS
During opening
STOPS
→
Gate open
CLOSES
→
During closing
STOPS
→
After a STOP
inverts the motion
→
→
Operation in response to the START command:
Gate closed
OPENS
During opening
UNINFLUENTIAL
→
Gate open
Reloads the automatic closing time if automatic closing
→
is enabled, otherwise it closes.
→
Description
DIP
Status
Function
DIP 7
DIP 8
Enables pre-flashing of 3 seconds before motor activation during opening and closing.
Disables pre-flashing.
ON
OFF
PRE-FLASHING
10 - DIP SWITCH SW2
The settings are stored during the rest phase (gate closed).
The default settings are highlighted in the boxes with grey background.
Description
DIP
Status
Function
Terminal 20 functions as
PHOTOCELL 1
input.
Terminal 23 functions as
PHOTOCELL 2
input.
DIP 1
DIP 2
OFF
OFF
TERMINALS 20 and 23
PROGRAMMING
Terminal 20 functions as
PHOTOCELL 1
input.
Terminal 23 functions as
N.C. FRAME
input.
ON
OFF
Terminal 20 functions as
PHOTOCELL 1
input.
Terminal 23 functions as
OPEN
input.
OFF
ON
Terminal 20 functions as
N.C. FRAME
input.
Terminal 23 functions as
PHOTOCELL 1
input.
ON
ON
DIP 3
DIP 4
OFF
OFF
GATE PHASE
SHIFT TIME
Motor 2 delay during opening: 2 seconds.
Motor 1 delay during closing: 3 seconds.
ON
OFF
Motor 2 delay during opening: 2 seconds.
Motor 1 delay during closing: 5 seconds.
OFF
ON
Motor 2 delay during opening: 3 seconds.
Motor 1 delay during closing: 4 seconds.
ON
ON
Motor 2 delay during opening: 3 seconds.
Motor 1 delay during closing: 6 seconds.
UK
15