24
FLOOR
UK
Power the automatic system:
• If installed, check for the correct operation of the limit switch manually moving the leaf.
Run one or more operation cycles and check:
• The correct operation of the safety devices;
• The correct movement of both the leaves;
• That the foundation plate is solid;
• That the automatic gate complies with the essential safety requirements required by the Machinery Directive
(2006/4/CE)
For more details and informations on European Directives please visit web site:
www.gibidi.com
If you need to install the operator within an existing box you must check that the box has the supporting post of
[
]
the leaf shaped like
À
18
.
[
]
If the foundation box does not have the lightening in
À
18
you must create them using proper tools (flexible),
the work area will need to apply a protective coat to avoid oxidation (zinc spray).
In the event of any malfunction, cut the power to the system and call in a qualified technician (installer).
During out of service activate manual release to allow manual opening and closing.
Carry out periodic checks on the gate with particular attention to:
• Check the hinges;
• Check the correct operation of the safety devices;
• Unlock the operator and verify there is no friction points during the whole stroke;
• Check the self-lubricating bushing.
Periodically check the correct functioning of anti-crushing safety and the efficiency of the unlocking system which
allows the manual operation (see relevant paragraph).
The safety devices installed must be checked at least each 6 months.
Gi.Bi.Di. S.r.l. reserves the right to modify the technical data without prior notice depending on the product
development.
17
- FINAL CHECKS
18
- FLOOR 830-824 INSTALLATION WITHIN OLDER FLOOR 810-812 FOUNDATION BOX
20
- MALFUNCTIONING
19
- MAINTENANCE
Summary of Contents for FLOOR 824
Page 26: ...26 FLOOR NOTE NOTES...
Page 27: ...27 FLOOR NOTE NOTES...