![background image](http://html1.mh-extra.com/html/gbc/boiler-1-4-e/boiler-1-4-e_instruction-manual_570875028.webp)
28
BOILER
1”
-
4”
K
Istruzioni originali—rev.2011—in accordo al 1.7.4 della direttiva macchine 2006/42/CE
G.B.C. Industrial Tools S.p.A.
Via Sandro Pertini 41/43 –
25046
Cazzago San Martino (Bs) –
Italia –
Tel. + 39 030 7451154 –
Fax. + 39 030 73 56 629
Screw back on the vane expansion nut all the way.
Rotate the shaft clockwise with long nose pliers and extract it.