![background image](http://html1.mh-extra.com/html/gbc/boiler-1-4-e/boiler-1-4-e_instruction-manual_570875031.webp)
31
BOILER
1”
-
4”
K
Istruzioni originali—rev.2011—in accordo al 1.7.4 della direttiva macchine 2006/42/CE
G.B.C. Industrial Tools S.p.A.
Via Sandro Pertini 41/43 –
25046
Cazzago San Martino (Bs) –
Italia –
Tel. + 39 030 7451154 –
Fax. + 39 030 73 56 629
Insert the tool abutment bush supplied with the elbow locking kit.
Take the shaft from the reduced shaft kit and use a marker to mark the groove of the lap joint as well as the far
end of the shaft as shown in the picture.