![background image](http://html1.mh-extra.com/html/gbc/boiler-1-4-e/boiler-1-4-e_instruction-manual_570875011.webp)
11
BOILER
1”
-
4”
K
Istruzioni originali—rev.2011—in accordo al 1.7.4 della direttiva macchine 2006/42/CE
G.B.C. Industrial Tools S.p.A.
Via Sandro Pertini 41/43 –
25046
Cazzago San Martino (Bs) –
Italia –
Tel. + 39 030 7451154 –
Fax. + 39 030 73 56 629
TRANSPORT RECOMMENDATIONS
Weight of the Machine
kg
13
Shipping Dimensions
mm
670x480x240
Shipping Weight
kg
35
Under 25 Kgs no lifting machines are required.
1
Always wear protective gloves and eyewear.
2
Always disconnect the machine from the power source during the setup.
3 Always use both hands while operating the machine, one on the security
lever and one on the feeding hand wheel.
4 The Instruction Manual and the drawings will supply quick and easy ex-
planations.
Using properly the PPE entails the only risks to be generated by the user
’
s system and not by in born defects of
our machines.