
46
BOILER
1”
-
4”
K
Istruzioni originali—rev.2011—in accordo al 1.7.4 della direttiva macchine 2006/42/CE
G.B.C. Industrial Tools S.p.A.
Via Sandro Pertini 41/43 –
25046
Cazzago San Martino (Bs) –
Italia –
Tel. + 39 030 7451154 –
Fax. + 39 030 73 56 629
Remove the locking jaws
Ensure the vane expansion nut is not abutted, then unscrew the vane abutment cap and the vane abutment bush
counter
-
clockwise.