Completing the Installation 19
3.
Leave enough slack in the cables to allow them to flex when the
drawer is pulled out.
4.
Check the cables for tight spots while the drawer is being pulled
forward and pushed back into place. Check for stress points especially
at the bends in the cable retractor and where the cable retractor is
mounted to the vertical mounting rail.
5.
Route the cables to their destinations and secure with tie straps as
required.
6.
If necessary, bundle and secure excess cable with a tie strap to keep it
out of the way.
Securing the System
1.
Close the rear door of the system. Lock if desired.
2.
Push the system drawer back until its front panel presses against the
vertical mounting rails in the cabinet. Secure the drawer with four
screws.
3.
Close the front door. Lock if desired.
3437.boo Page 19 Wednesday, October 7, 1998 4:01 PM