33
19.1.
Wiring principle
General
principles:
1. Wires, equipment and connectors supplied for use on the site must be in compliance with provisions of
regulations and engineering requirements.
2. Only electricians holding qualification are allowed to perform wire connection on the site.
3. Before connection work is started, the power supply must be shut off.
4. Installer shall be responsible for any damage due to incorrect connection of the external circuit.
5. Caution --- MUST use copper wires.
6. Connection of power cable to the electric cabinet of the unit
7. Power cables should be laid out through cabling trough, conduit tube or cable channel.
8. Power cables to be connected into the electric cabinet must be protected with rubber or plastic to prevent
scratch by edge of metal plate.
9. Power cables close to the electric cabinet of the unit must be fixed reliably to make the power terminal in
the cabinet free from an external force.
10. Power cable must be grounded reliably
19.
Electric wiring work
19.2.
Specification of power supply wire and leakage switch
Power cable specifications and Leakage switch types in the following list are recommended
Power Supply
Air Break
Switch
Minimum
Section Area of
Power Wire
V, Ph, Hz
A
mm
2
GSR-M4-DC/M
16
3 x 1,5
GSR-M6-DC/M
16
3 x 1,5
GSR-M8-DC/M
16
3 x 1,5
GSR-M10-DC/M
32
3 x 4
GSR-M12-DC/M
32
3 x 4
GSR-M14-DC/M
40
3 x 4
GSR-M16-DC/M
40
3 x 4
GSR-M10-DC/T
16
5 x 2,5
GSR-M12-DC/T
16
5 x 2,5
GSR-M14-DC/T
16
5 x 2,5
GSR-M16-DC/T
16
5 x 2,5
Model
220~240VAC,
1Ph, 50Hz
380~415VAC,
3Ph, 50Hz
Note :
a. Leakage Switch is necessary for additional installation. If circuit breakers with leakage protection are in
use, action response time must be less than 0.1 second, leakage circuit must be 30mA.
b. The above selected power cable diameters are determined based on assumption of distance from the
distribution cabinet to the unit less than 75m. If cables are laid out in a distance of 75m to 150m, diameter
of power cable must be increased to a further grade.
c. The power supply must be of rated voltage of the unit and special electrical line for air-conditioning.
d. All electrical installation shall be carried out by professional technicians in accordance with the local laws
and regulations.
e. Ensure safe grounding and the grounding wire shall be connected with the special grounding equipment of
the building and must be installed by professional technicians.
f. The specifications of the breaker and power cable listed in the table above are determined based on the
maximum power (maximum amps) of the unit.
g. The specifications of the power cable listed in the table above are applied to the conduit-guarded multi-wire
copper cable (like, YJV XLPE insulated power cable) used at 40
℃
and resistible to 90
℃
(see IEC 60364-5-
52). If the working condition changes, they should be modified according to the related national standard.
h. The specifications of the breaker listed in the table above are applied to the breaker with the working
temperature at 40
℃
. If the working condition changes, they should be modified according to the related
national standard.