Assembly Instructions
Page
24
10/09
Fig.A12 1880/90RT CTC Hitch frame.
Metering System
If you have informed the dealer of your
planting needs at the time of purchase the
seeder may already be ready for use.
However, if changes need to be made refer
to the ‘Metering System’ section for altering
the meter system configuration.
Fig. A13 Meterbox Assembly.
Check all Wheel Nuts
Wheel nuts can work loose in
transportation and should be checked
before towing. Once the seeder is
operating the wheel nuts should again be
checked until they have bedded in.
Monitor and Electrical System
The Air Seeder is supplied with a
monitor and loom system that will need to
be mounted in the tractor cab. Depending
on the model and options ordered there
should be a couple of monitors, a worklight
switch bracket, a clutch switch box (ground
drive models only) and other components
as required.