5)  As there is no pressure downstream the regulator the slam shut valve GIPS-FC will be closed. So that press 

the by-pass or push button in the slam shut valve to pressurize the line between the slam shut valve and the 
pressure regulator. 

6)  Still  using  the  by-pass  or  push  button  of  SSV,  charge  slowly  the  regulating  spring  of  pilot  in  the  monitor 

regulator  in  order  to  admit  a  small  pressure  downstream  of  both  regulators.  Utilize  the  gauge  to  check 
increase in pressure and adjust it at least 20% above of under pressure shut down. 

7)  As the SSV actuator will be pressure relase the by-pass or push button and reset the actuator. 
8)  Reset the obturator of GIPS-FC using the respective lever. 
9)  Open the vent valve around 20% and check if set point is still the same. 
10) Turn  the  regulating  screw  clockwise  of  monitor  regulator  pilot  to  achieve  the  desired  set  point.  Then  the 

monitor regulator will start operating. 

11) In case of outlet pressure variation check the restrictor installed in the inlet of pilot. 
12) With the pressure stable open the vent valve and check the set point. 
13) If the set point is correct, close the vent valve in order to check the lock up of monitor regulator. 
14) With the set point of monitor regulator correct release slowly the regulating spring of active regulator counter-

clockwise reducing the respective set point. 

15) Adjust the active regulator set point at least 0.5 kgf/cm²g lower than the set point of monitor regulator in order 

to allow it to stay totally open in only the active regulator will keep working. 

16) At  this  moment,  the  active  regulator  will  work  and  the  monitor  regulator  will  be  totally  opened  waiting  for  a 

possible failure of active one to work. 

17) If the outlet pressure is oscillating, proceed a thin adjustment using the pilot restrictor. 
18) With pressure stable open the vent valve and check the set point. 
19) If the pressure is correct close the vent valve and check the lock up of active regulator. 
20) While checking lock up a new simulation of stop in gas consumption by user, that is a normal condition and in 

this case, both valves shall close. 

21) Check if there is any leak. 
22) Open SLOW AND GRADUALLY the outlet ball valve to pressurize the line. 
23) If necessary, proceed with thin pressure adjustment using pilot and restrictor installed on it. 

 

4.6.5 STAND BY STREAM ADJUSTMENT (ACTIVE / MONITOR SYSTEM) 

When the pressure  regulator  is  installed  in  a  stand  by  line  with  active  /  monitor  configuration  it is  recommended 
that same procedure informed in item 4.6.4 had been done, however the set point of active regulator of stand by 
stream shall be adjusted around 15% – 20% lower than the set point of regulator of working stream. 
Open SLOW AND GRADUALLY the outlet ball valve to allow the downstream pressure of regulator in the stand 
by stream equalize with the pressure of working stream; the stand by regulator will remain closed. 
To  make  the  regulator  of  stand  by  stream  assumes  the  regulating  turn  clockwise  the  regulating  spring  of  active 
regulator  up  to  achieve  the  set  point  over  than  the  working  regulator;  then  the  stand  regulator  will  open  and 
assume the operation. 
It is important that both regulators keep with difference of set point at least of 5%~10% avoiding over position of 
set point causing looping between the lines; it means that one regulator open, suddenly the other one, resulting in 
non-precision pressure regulating. 
 

SET POINTS RECOMMEDED TABLE 

Main Active 

Regulator 

(PS) 

Stand By 

Active 

Regulator 

Monitor 

Regulator 

Relief 

SSV 

0.7 – 5 bar 

PS x 0.9 

PS x 1.15 

PS x 1.4  PS x 1.5 

4.5 - 18 bar 

PS x 0.9 

PS x 1.10 

PS x 1.2  PS x 1.3 

14 – 36 bar 

PS x 0.95 

PS x 1.05 

PS x 1.2  PS x 1.3 

Summary of Contents for ARGOS

Page 1: ...Installation Operation Maintenance Manual Pressure Regulating Valve Model ARGOS...

Page 2: ...PERATION PRINCIPLE 10 3 1 THE REGULATOR 10 3 2 REGULATOR ACTIVE MONITOR SYSTEM 11 3 3 PILOTS 12 3 4 FITLERS 12 3 5 SECURITY SHUT OFF VALVE 13 4 5 1 PH ACTUATOR H ACTUATOR 13 4 5 2 GENERAL RESET PROCED...

Page 3: ...3347 990 Phone 55 19 3936 9300 Fax 55 19 3935 6009 Email vendas gascat com br sales gascat com br The items that follow although not exhaustive provide guidance on possible sources of danger to health...

Page 4: ...system with an inert gas such as nitrogen Special precautions are required for operation with gases such as oxygen or hydrogen chloride and the user must ensure that proper procedures are implemented...

Page 5: ...temperature limits given in this manual or in any applicable standard shall not be exceeded under any circumstances under risk of damage to the equipment to the installation safety and to the people i...

Page 6: ...T PRESSURES Pressure regulators model ARGOS can use three pilot models for pressure control G80 G30F or G32F The table below presents the adjustment ranges of each model G80 PILOT SPRING COLOR PART NU...

Page 7: ...E SPRING RANGE SET POINT SSV ACTUADOR H SPRING COLOR PART NUMBER RANGE PURPLE 01 52 61 0 3 1 5 bar RED 01 52 62 1 0 5 0 bar YELLOW 01 51 54 4 0 11 0 bar SSV ACTUATOR PH SPRING COLOR PART NUMBER RANGE...

Page 8: ...rado Verificado Aprovado CSQ Data Revis o P gina JJ VBL JM 13 02 19 07 8 de 32 2 3 11 PRESSURE REGULATOR DIMENSIONS DIMENSIONS mm A RF B C ND 150 PN16 300 PN25 PN40 ANY CLASS ANY CLASS 1 184 197 222 2...

Page 9: ...Regulating Valve MI 23 Elaborado Verificado Aprovado CSQ Data Revis o P gina JJ VBL JM 13 02 19 07 9 de 32 DIMENSIONS mm A RF B C ND 150 PN16 300 PN25 PN40 ANY CLASS ANY CLASS 2 254 267 550 300 3 298...

Page 10: ...of flow absence stays closed because the outlet pressure added to obturator spring of pilot is superior to the regulating spring force and moves the obturator set upward against the pilot seat closin...

Page 11: ...set point of this pilot and then the monitor regulator can assume the control of pressure reduction in the system From this moment the working principle of this valve is similar then the active regul...

Page 12: ...he pre pilot 3 4 FILTERS The GASCAT pilot blocks consisting of a pilot and pre regulator always have a mechanical barrier against solid impurities this barrier comprises a polypropylene filter element...

Page 13: ...ease the external bush will move up or move down allowing the spheres running out of channel and the main shaft moves according to the force exerted by closing spring to close the valve against the se...

Page 14: ...eset the shut off it is necessary to equalize the pressure before and after the shutter However it is necessary to use the integrated bypass in the reset lever See below how to proceed When there is a...

Page 15: ...m the equipment were supplied and are respecting the recommended dimensions by the manufacturer 6 It was foresee pressure gauge or other pressure indicator to allow correct setting during the commissi...

Page 16: ...l ARGOS 6 Partial pressure relief valve CH Relief 7 Outlet pressure gauge 8 Vent valve 9 Outlet ball valve or similar Notes 1 The position of sensing line can be inferior than 5 times if the project o...

Page 17: ...lator Argos 8 Partial pressure relief valve model CH Relief 9 Outlet pressure gauge 10 Vent valve 11 Outlet ball valve or similar Notes 1 The position of sensing line can be inferior than 5 times if t...

Page 18: ...ure regulator model ARGOS 7 Partial pressure relief valve model CH Relief 9 Outlet pressure gauge 9 Vent valve 10 Outlet ball valve or similar Notes 1 The position of sensing line can be inferior than...

Page 19: ...regulator valve model ARGOS 2nd stage of pressure reduction 8 Partial pressure relief valve model CH Relief 9 Pressure gauge 9 Vent valve 10 Outlet ball valve or similar Notes 1 The position of sensi...

Page 20: ...tly in the actuator before proceeding the stream pressurization The regulator model Argos is not supplied adjusted It tends to preserve the life time of internal parts So that it is necessary to adjus...

Page 21: ...the stand by regulator assumes the pressure regulating the respective pilot regulating spring shall be turned clockwise slowly up to achieve set point lightly over than the set point of working stream...

Page 22: ...d waiting for a possible failure of active one to work 17 If the outlet pressure is oscillating proceed a thin adjustment using the pilot restrictor 18 With pressure stable open the vent valve and che...

Page 23: ...Use the pressure gauge to check it and adjust the regulator at least 20 above set point of under shut down of SSV 7 As the actuator is already pressurized release the by pass or push button and reset...

Page 24: ...t point adjustments and start up of the GASCAT s regulators model ARGOS it is required only the use of a 7 8 combination spanner for setting up the pilot s adjustment springs Valves model URANO are su...

Page 25: ...ls below to check on their availability E mail sales gascat com br PROBLEM CAUSE CORRECTION Non good Working Outlet Pressure Variation Low Flow less than 5 of maximum flow capacity Check operating con...

Page 26: ...c certainly the service intervals should be shorter GASCAT has standard repair kits for each component of the pressure regulator model ARGOS containing the most likely items to wear with time this lis...

Page 27: ...anual Argos Pressure Regulating Valve MI 23 Elaborado Verificado Aprovado CSQ Data Revis o P gina JJ VBL JM 13 02 19 07 27 de 32 6 1 RECOMMENDED REPAIR PARTS AND KITS ARGOS POS DESCRIPTION QTY 1 DIAPH...

Page 28: ...sure Regulating Valve MI 23 Elaborado Verificado Aprovado CSQ Data Revis o P gina JJ VBL JM 13 02 19 07 28 de 32 ARGOS SSV POS DESCRIPTION QTY 1 DIAPHRAGM 1 2 O RING 1 3 O RING 1 4 O RING 1 5 O RING 1...

Page 29: ...ulating Valve MI 23 Elaborado Verificado Aprovado CSQ Data Revis o P gina JJ VBL JM 13 02 19 07 29 de 32 G30F G32F PILOT POS DESCRIPTION QTY 1 RELIEF 1 2 DIAPHRAGM 1 3 SHUTTER 1 4 FILTER ELEMENT 1 5 O...

Page 30: ...JM 13 02 19 07 30 de 32 PILOT G 80 POS DESCRIPTION QTY POS DESCRIPTION QTY 1 RELIEF 2 11 O RING 1 2 DIAPHRAGM 1 12 O RING 1 3 DIAPHRAGM 1 13 O RING 2 4 SHUTTER 1 14 O RING 1 5 SHUTTER 1 15 O RING 1 6...

Page 31: ...SV POS DESCRIPTION QTY POS DESCRIPTION QTY 1 RELIEF 1 8 O RING 1 2 O RING 1 9 O RING 1 3 O RING 1 10 O RING 2 4 PARBAK RING 1 11a O RING 1 5 O RING 1 11b DIAPHRAGM 1 6 O RING 1 12 O RING 1 7 O RING 1...

Page 32: ...pattern for five times until proper specified torque is achieved Each time around when all screws are tightened to the required torque the diaphragm will compress a little until the plates are in dire...