7
ENGINE, CLUTCH AND CHAIN SETUP
Parts Required:
•
6.5 HP, 212cc Predator Engine.
•
Centrifugal Clutch.
•
#415 Chain.
•
4 X 5/16-18 Bolts, Washers and Nuts.
•
1 X 5/16-24 bolt with BIG washer and
thick
washer for clutch.
Installation:
•
Remove the key from the shaft and install the
thick
washer on the engine shaft followed by the
centrifugal clutch.
•
Then place the centrifugal clutch on the shaft using the 5/16-24 nut and BIG washer and tighten
them to fix the position.
•
Now place the engine on the engine mount and align with the left rear hole of the engine with the
left real slot on mount. (As if you are standing behind the trike facing forward, Holding the engine
with the shaft outside to your left)
•
Then Secure the engine using 4 sets of nuts, bolts and washers (Only hand tight them).
Summary of Contents for GasTrike 212CC
Page 1: ...1 GASBIKE s TRIKE CONVERSION KIT...
Page 2: ...2...