11 SERVICE WORK ON THE CHASSIS
50
A00806-10
–
Using a plastic hammer, tap lightly on the upper triple clamp to
avoid stresses.
–
Tighten screws
8
.
Guideline
Screw, top triple clamp M8
20 Nm (14.8 lbf ft)
–
Secure the wiring harness with cable holder
9
on the left.
I00175-12
–
Position the brake caliper. Mount and tighten screws
bk
.
Guideline
Screw, front
brake caliper
M8
25 Nm (18.4 lbf ft)
Loctite
®
243™
–
Position the brake line and the clamp. Mount and tighten
screws
bl
.
Guideline
Screw, brake line
holder
EJOT
1.7 Nm (1.25 lbf ft)
Finishing work
–
Install front fender. (
–
Mount the handlebar cushion.
–
Install the start number plate. (
–
Install the front wheel.
–
Check that the wiring harness, throttle cables, and brake and clutch
lines can move freely and are routed correctly.
–
Check the steering head bearing for play. (
–
Remove the motorcycle from the lift stand. (
11.11
Checking the steering head bearing play
Warning
Danger of accidents
Incorrect steering head bearing play impairs the handling characteristic and damages com-
ponents.
–
Correct incorrect steering head bearing play immediately. (Your authorized GASGAS Motorcycles workshop will
be glad to help.)
Info
If the vehicle is operated for a lengthy period with play in the steering head bearing, the bearings and the bearing
seats in the frame can become damaged over time.
Preparatory work
–
Raise the motorcycle with a lift stand. (
Summary of Contents for MC 350F 2023
Page 1: ...OWNER S MANUAL 2023 MC 350F EX 350F Art no 3215099en...
Page 2: ......