Magnum 6K25 Managed Fiber Switch Installation and User Guide (04/06)
58
www GarrettCom com
.
.
or equivalent.
5. Fastening torque of the lugs on the terminal block: 9 inch-pound max.
6. Centralized DC Power Source cable securement, use at least four cable ties to
secure the cable to the rac,k at least 4 inches apart, with the first one located
within 6 inches of the terminal block.
B5.0 OPERATION
Operation of Magnum 6K25 Switches with the optional -48VDC, 24VDC and
125VDC power supply is identical to that of the standard AC-powered models.
B6.0 ORDERING
INFORMATION
To order the optional -48VDC power supply factory installed, add a suffix of “-
-48VDC” after the product’s standard model # Example:
Magnum 6K25R-48VDC.
Similarly to order the optional 24VDC or 125VDC industrial specific power
supply factory installed, add a suffix of “ 24VDC” or “125VDC” after the product ‘s
standard model #. Example: Magnum 6K25- 24VDC, Magnum 6K25-125VDC.
B7.0 TROUBLESHOOTING
Please refer to Section 6.0 for troubleshooting