background image

20

21

EN

EN

Assembly instructions for installer / 

Step-by-Step installation

Assembly instructions for installer / 

Step-by-Step installation

L1 N

PE

L1

N

PE

L2 L3

L2 L3

(figure 9)

10. Screw the back panel onto the wall using three screws suitable for the wall 

surface. See red arrows in figure 9.

11. Feed the cable through the cable inlet.

Be careful not to damage the circuit boards or components during 
installation.

12. Connect the cable onto the terminal blocks. The terminal blocks are compatible 

with cables measuring 1.5 mm²–6 mm² up to 10 mm² in 32A Wallbox. 

The GLB+ Wallbox must be grounded through a permanent wiring 
system.

Use the GLB+ Wallbox only within the specified operating parameters.

13. Check if the charging current needs to be reduced. If so, refer to the section: 

Reducing the charging current.

Incorrect installation and testing of the GLB+ Wallbox could potentially 
damage either the vehicle’s Battery and/or the GLB+ Wallbox itself.

Refer to local standards and regulations not to exceed charging current 
limitations.

To balance out the load, it is important to rotate the phases when 
connecting several of GLB+ Wallbox to the same system. Note that 
1-phase charging is common in electric vehicles and L1 in the GLB+ is 
used for this purpose.

This product is already internally Dielectric Voltage Withstand Tested 
from the factory. It is important not to connect the product when doing 
an external Dielectric Voltage Withstand Test, since the product has 
electronics connected to the PE.

Connection of phases for 3-phase 
charger to 3-phase system as below. 
When connecting a 3-phase charger to 
1-phase system connect phase to L1. 

9.

(Optional, only when connecting communication cable to GLB+) 

Press out the knock-out on the GLB+ Wallbox back panel, mount a cable gland. 
See red circle in figure 9. Feed the communication cable through the cable inlet.

INC. TERMINAL

L3

N PE

L2

L1

L

N

PE

L3

N

PE

L2

L1

3-phase

1-phase

L1 N

PE

L1

N

PE

L2 L3

L2 L3

L1 N

PE

L1

N

PE

L2 L3

L2 L3

Summary of Contents for Wallbox GLB+

Page 1: ...EN GARO Wallbox GLB Assembly instructions End User Instruction EN 380200 2 0...

Page 2: ...e 1 with cable and connector type 1 or 2 with type 2 socket outlet figure 3 figure 2 A Front cover B Cover C Back panel D Indication light E Key F Connector type 1 or 2 G Type 2 socket outlet H RCCB R...

Page 3: ...electric vehicles 29 Resetting Conditioning of RCCB or RCBO 31 Care 32 Troubleshooting 33 Index 34 The purpose of this Manual is to provide you with the necessary information to charge your electric v...

Page 4: ...nge of charging stations is designed exclusively for charging electric vehicles The GLB Wallbox must be grounded through a permanent wiring system Do not install or use the GLB Wallbox near flammable...

Page 5: ...reful not to damage the circuit boards or components during installation Refer to local standards and regulations to ensure that charging current limits are not exceeded The front cover must always be...

Page 6: ...3 IP classification IP44 Mechanical impact resistance IK08 Application temperature 250 C 400 C without direct sunlight Storage temperature 350 C 550 C Installation height 0 5 1 5 metres above ground...

Page 7: ...12 13 EN EN 205 124 422 Dimensional drawing Dimensional drawing figure 5...

Page 8: ...re 6 Type Label example Important information for installer table 1 GLB Wallbox have a internal DC monitor protection implemented which is compliant with follow IEC 60364 7 722 Calculate to determine...

Page 9: ...h through cardboard template Wire cutter Voltmeter or digital multimeter to measure AC voltage at the installation site Small flathead screwdriver Medium flathead screwdriver Large flathead screwdrive...

Page 10: ...ata Do not install or use the GLB Wallbox near flammable explosive harsh or combustible materials chemicals or vapors Avoid mounting the wall box in direct sunlight The charging current will be reduce...

Page 11: ...either the vehicle s Battery and or the GLB Wallbox itself Refer to local standards and regulations not to exceed charging current limitations To balance out the load it is important to rotate the ph...

Page 12: ...14 Carefully place the cover in position from the front Ensure the inserts on the right hand side fit into the groove and the cover is perfectly positioned all around 15 Adhere language label labels o...

Page 13: ...20 Connect the power and ensure the indication light is solid green 21 If not refer to the section on Troubleshooting 22 When solid green light is shown the charger is ready for use To confirm that th...

Page 14: ...e the GLB Wallbox near flammable explosive harsh or combustible materials chemicals or vapors Use the GLB Wallbox only within the specified operating parameters Do not use this equipment if it appears...

Page 15: ...end 4 After charging ensure the cable is either removed or coiled and suspended to avoid damage and eliminate the risk of a trip hazard For wallboxes with a socket it is important to ensure that the...

Page 16: ...n then reset the circuit breaker 5 Close the front cover by sliding it upwards 6 Lock the front cover with the key Resetting Conditioning of RCCB or RCBO Do not modify the equipment installation or an...

Page 17: ...x the charging cable and the end of the charging cable should be periodically wiped with a clean dry cloth to remove accumulation of dirt and dust Avoid mounting the wall box in direct sunlight The ch...

Page 18: ...ortant information for installer 14 Indication light 2 29 Installation height 11 IP classification 11 J K Key 2 16 L Language labels 16 M Mechanical impact resistance 11 N Notes 8 INDEX Index O P Q R...

Page 19: ...GARO AB Box 203 SE 335 25 Gnosj Phone 46 0 370 33 28 00 Fax 46 0 370 33 28 50 info garo se garo se...

Reviews: