INSTALLATION OF STANDALONE GTB TWINBOX
4. Check/set the dip 1-3 on SW1 CC2 to the max Ampere
(A) that the outlets can load/charge, for example GTB11kW:
16+16A=32A
Dip switch SW1 is located in the center of left hand side of CC2,
see picture 7.
5. With dip 1-3 on SW2 on both CC1 and CC2, you can
(when needed) reduce the charge current (A) separate for left/
right hand side of the Twinbox. Available range is 6A – MAX32A,
see picture 8. This is normally not necessary to do at a standard
installation.
Note: it is ok to set different value for left and right hand side.
SW2 on CC1 controls left hand side and SW2 on CC2 controls
right hand side.
Dip switch SW2 is located at bottom left hand side on both CC1
and CC2, see picture 7.
(picture 7)
SW1
SW2
ON OFF
ON OFF
3
3=OFF
16A
3
3=OFF
6A
2
2=OFF
2
2=OFF
1
1=ON
1
1=ON
3
3=OFF
20A
3
3=OFF
10A
2
2=ON
2
2=ON
1
1=OFF
1
1=OFF
3
3=OFF
25A
3
3=OFF
13A
2
2=ON
2
2=ON
1
1=ON
1
1=ON
3
3=ON
32A
3
3=ON
16A
2
2=OFF
2
2=OFF
1
1=OFF
1
1=OFF
3
3=ON
40A
3
3=ON
20A
2
2=OFF
2
2=OFF
1
1=ON
1
1=ON
3
3=ON
50A
3
3=ON
25A
2
2=ON
2
2=ON
1
1=OFF
1
1=OFF
3
3=ON
63A
3
3=OFF
29A
2
2=ON
2
2=OFF
1
1=ON
1
1=OFF
3
3=ON
32A
2
2=ON
1
1=ON
(picture 8)
8
EN