INSTALLATION OF STANDALONE GTB TWINBOX
The first GTB Twinbox in the grid will be the “Master” in the
installation and it is set by SW1 Dip 5 on CC2. All other units in
the grid should be “slaves” set by SW1 Dip 5 on CC2.
First and last GTB Twinbox in the grid should be “end-terminated”
and this is set by SW1 Dip 6 on CC2.
(picture 14)
Schematic image with Twinbox placed in the center of the cluster
Settings explanation of Dip 5, 6 on SW1 CC2
(table 3)
SW1 CC2
SW1 CC2
SW1 CC2
SW1 CC2
ON OFF
ON OFF
ON OFF
ON OFF
6
6
6
6
5
5
5
5
SLAVE
SLAVE
MASTER
SLAVE
End term
End term
SW1
CC2
SW1
CC2
ON
OFF
ON
OFF
MASTER
5
SLAVE
5
SW1
CC2
SW1
CC2
End term
ON
OFF
End term
ON
OFF
OFF
6
ON
6
13
EN