GNS 430(A) Pilot’s Guide and Reference
190-00140-00 Rev. P
SECTION 6
PROCEDURES
6-4
DO NOT USE FOR
NAVIGATION
Figure 6-7 Sample Approach
Select Destination
‘Select’ and ‘Load’ the
approach
‘Activate’ the
approach
Approach operations on the GNS 430 typically begin
with the same basic steps (refer to Figure 6-7 for the
following steps):
1) Select the destination airport using the
Direct-
to
Key, or as the last waypoint in the active
flight plan.
2) Choose the ‘Select Approach?’ option from
the Procedures Page (Section 6.1) or from the
Active Flight Plan Page Menu (Section 5.2,
Active Flight Plan Options).
3) ‘Load’ the approach (often while enroute) in
anticipation of its future use. This places the
approach in the active flight plan, but retains
course guidance in the enroute section until
the approach is ‘activated’.
4) ‘Activate’ the full approach or vectors-to-final,
as appropriate. In some scenarios, it may be
more convenient to immediately activate the
approach and skip the ‘Load’ process outlined
in the preceding step 3. The GNS 430 provides
both options.
Approaches with Procedure Turns
The procedure turn portion of an approach is stored
as one of the legs of the approach. For this reason, the
GNS 430 requires no special operations from the pilot
(other than flying the procedure turn itself) beyond what
is required for any other type of approach.
Figure 6-8 Sample Approach with Procedure Turn
DO NOT USE FOR
NAVIGATION
Lynchburg (VA) Regional
VOR or GPS Rwy 03
This example uses the VOR Runway 03 approach for
Lynchburg (Virginia) Regional Airport, KLYH, and assumes
a departure from Frederick (Maryland) Municipal Airport,
KFDK.
Summary of Contents for GNS 430
Page 1: ...GNS 430 A Pilot s Guide and Reference ...
Page 2: ......
Page 116: ...GNS 430 A Pilot s Guide and Reference 190 00140 00 Rev P SECTION 6 PROCEDURES 6 34 Blank Page ...
Page 265: ......