Commissioning
7
© Gardner Denver Deutschland GmbH
33
/
44
08.2019 · 610.44434.40.000
Commissioning
Measures after a long shut-down period
Replace ball bearings and radial shaft seal
!
When the downtime exceeds
4 years
since the last commissioning.
1. Replace the rolling bearing.
2. Clean adjacent bearing areas for open ball bearings and re-grease.
3. Replace and grease the radial shaft seal.
If the standstill conditions vary (Storage [
➙
20]), a reduced ball bearing service life
is to be expected.
Measuring the motor insulation resistance
Measure the insulation resistance of the motor at 500V DC voltage between
the conductors of the main circuit and protective conductive system.
Value ≥1 MΩ: no measures necessary.
Value <1 MΩ: Dry winding.
Tests during commissioning or re-commissioning
CAUTION
Overpressure!
Overpressure during the leak test can damage the G-BH1 | G-BH9.
To test the plant for leaks, the G-BH1 | G-BH9 must be excluded.
Prior to commissioning or recommissioning of the G-BH1 | G-BH9, check
that:
The G-BH1 | G-BH9 is properly fitted and aligned.
Rotating components move freely.
Auxiliary ventilator (if available) is ready for operation.
Pipes and hoses are correctly connected.
Attachments, screw fittings and electrical connections are fixed at the given
tightening torques.
The operating conditions match the rating plate details given above.
The maximum speeds are monitored and adhered to through the control.
Protection measures against accidental contact have been completed.
Cooling air supply is not affected.
Check the direction of rotation
Test the direction of rotation of the compressor
1. Switch on the G-BH1 | G-BH9 briefly and then switch it off again.
2.
WARNING! When the electrical connection is incorrect: Risk of injury
as a result of being pulled or sucked in! Do not perform the overpressure
test with your hands!
Perform the overpressure test on the gas outlet using a piece of paper (item
N2.0, [
➙
14]).
Overpressure present: direction of rotation is correct, no measures
Negative pressure present: Direction of rotation incorrect, change direction
of rotation by interchanging two phases of electrical supply line