10
Figure 3a
General Layout Drawing
(Models 750 through 3200)
FRONT VIEW
REAR VIEW
TOP VIEW
LEFT TOWER
PRESSURE GAUGE
PRESSURE REGULATOR
& PILOT AIR FILTER
OUTLET CHECK VALVE
DEWPOINTER
(OPTIONAL)
TOWER PURGE
EXHAUST VALVE
DESICCANT
FILL PORT
DESICCANT
DRAIN PORT
TOWER
INSULATION
(OPTIONAL)
PURGE
PRESSURE GAUGE
RIGHT TOWER
PRESSURE GAUGE
HIGH TENSION
ENCLOSURE
CONTROL
ENCLOSURE
ASME RELIEF VALVE
HOT PIPE INSULATION
(OPTIONAL)
PURGE INLET
CHECK VALVE
IN
VXD
TOWER INLET
VALVE
ASME CODE TAG
PURGE ADJUSTING VALVE
(REMOVE HANDLE AFTER
INITIAL DRYER TEST)
PURGE SAVER
(OPTIONAL)
PURGE
HEATER WITH
INSULATION
PURGE SAVER
INTAKE SHUT-OFF
VALVE (OPTIONAL)
PURGE SAVER
INTAKE FILTER
(OPTIONAL)
PURGE SHUT-OFF VALVE
HEATER TEMP
THERMOCOUPLE
(CENTER END IN PIPE)
(OPPOSITE SIDE)
HEATER OVERTEMP RTD
TOWER BLOW-
DOWN VALVE
TOWER
DEPRESS VALVE