REQUIRED (2) PER RAIL ASSEMBLY
REQUIRED (2) PER RAIL ASSEMBLY
CORNER
BOTTOM RAIL
CORNER
TOP RAIL
L
DETAIL L
SCALE 1 : 8
NUT DRIVER
DRILL
FOR 4FTX 8FT RACK
ONLY
(2) SETS REQUIRED
CENTER TOP
RAIL
CENTER
BOTTOM RAIL
FOR 4FTX 8FT RACK
ONLY
(2) SETS REQUIRED
CEILING
BRACKET
CORNER
RAILS
STEP 3: VERTICAL RAIL ASSEMBLIES TO CEILING BRACKETS
REQUIRED (1) PER CEILING BRACKET
ATTACHMENT
REQUIRED (1) PER CEILING BRACKET
ATTACHMENT
CENTER
RAILS
CEILING
BRACKET
N
DETAIL N
SCALE 1 : 4
CENTER
TOP RAIL
CEILING
BRACKET
P
DETAIL P
SCALE 1 : 4
CEILING
BRACKET
CORNER
TOP RAIL
PAGE 8
STEP 2: VERTICAL RAIL ASSEMBLIES
THE VERTICAL RAILS ARE ADJUSTABLE FROM 22" [560mm] TO 40" [1016mm]
DETERMINE THE DISTANCE YOU WANT YOUR OVERHEAD STORAGE RACK TO HANG DOWN FROM YOUR
1.
GARAGE CEILING.
ATTACH THE (4) SETS CORNER TOP RAILS TO CORNER BOTTOM RAILS.
2.
FOR 4FT X 8FT RACK ONLY
, ATTACHED THE (2) SETS OF CENTER TOP RAILS TO CENTER BOTTOM RAILS.
3.
Summary of Contents for GT7008A