background image

STRONG. SIMPLE. COMPACT.

Rev Date 23 0610

800.285.6780   [email protected]

EDGE

 INSTALLATION MANUAL PAGE 4

Mounting the 

EDGE

 Fixtures

•  EDGE

 series wet location fixtures are typically surface mounted (Walls, Soffits, etc.). If mounting to the 

building soffits, it is recommended to mount the fixtures on the outer edges of the soffits to maximize 
the distance from the building walls. Fixtures should be aimed downward and slightly inward toward the 
building for the best effect. 

• 

Each fixture has an input (male) and output (female) end.  The end of the fixture with the product 
identification label is the input end. The fixture must be installed with the input end oriented in the 
direction of your incoming power source or leader cable.

• 

The location of the fixtures must follow your site-specific layout.

• 

For long linear runs, G&G recommends using a chalk line or laser to mark the mounting bracket locations. 

• 

2’, 4’, and 6’ fixtures require at least two mounting brackets. Brackets should be installed near the ends of 
the fixtures. 8’ models require three brackets with the third bracket being installed near the center of the 
light fixture.

• 

This product makes use of a push-click connector system. An audible click upon insertion of the connector 
indicates that the connector is fully seated. Failure to fully seat connectors can lead to cable and fixture 
damage during use. 

Connect the power leader cable to 
the input connector (male) on the LED 
fixture. To do this, align the connectors, 
push inward, and listen for the audible 
click sound that indicates that the 
connector is fully seated.

When daisy chaining fixtures continue mounting fixtures and 
attach jumper cables as needed using the same push-click 
connection method as the leader cable.

Mount the fixture(s) in their specific location using the Surface Mount Bracket to affix directly to the ceiling or soffits.

Summary of Contents for EDGE

Page 1: ...azard if left unchecked This heating can also serve as an ignition source for gasses generated by the corrosion of metals inside of the enclosure Regularly scheduled inspections are recommended to ens...

Page 2: ...es Fixtures 2 Leader Cable s 3 Jumper Cable s 4 Termination Plug s 5 Mounting Brackets Ceiling or Wall 6 G G EDGE Power Data Translator PDT Includes controls power distribution and drivers 1 EDGE Stan...

Page 3: ...U fixtures in each string have 4 pin connectors THRU fixtures have a gray connector shell on the input end and a black connector shell on the output end while LEAD fixtures have black connector shells...

Page 4: ...ds using a chalk line or laser to mark the mounting bracket locations 2 4 and 6 fixtures require at least two mounting brackets Brackets should be installed near the ends of the fixtures 8 models requ...

Page 5: ...D at the bottom of the board below the driver fuses The input circuit shall be supplied with a 20A breaker on 120V systems or a 15A breaker on 277V systems Power Data Translator PDT Board The AC Input...

Page 6: ...The B outputs 1B and 2B have a limit of 40 feet G G recommends that the split be as even as possible within these limits For example if possible split 88 feet into a 48 foot string and a 40 foot stri...

Page 7: ...be connected to output 2A Failure to make the correct connections will lead to lighting effects being generated in an erratic manner To connect the leader cables to the LED Output terminals remove 2 3...

Page 8: ...ee discrete wires in the data cable these are marked on the board next to the terminals D D and COM Optionally the RJ45 8P8C connector can be used instead of the three terminals if the DMX source supp...

Page 9: ...be opened for outbound connections to allow the device to connect to our servers User Interface In order to access the ColorWash system you will need to create an account on the ColorWash dashboard a...

Reviews: