STRONG. SIMPLE. COMPACT.
Rev Date 23 0610
800.285.6780 [email protected]
EDGE
INSTALLATION MANUAL PAGE 3
NOTICE TO INSTALLERS
G&G EDGE lights must be installed on the building in accordance with the layout that is provided with the
system. Each string of lights must be connected to the LED output on the PDT as specified in the layout
documents. Failure to follow the layout or connecting a string of fixtures to the wrong LED output will lead to
lighting effects being generated in an erratic manner.
There are 2 different types of fixtures used in the EDGE lighting system. The first “LEAD” (LE) fixture on each
leader uses a 6-pin input connector, while all other “THRU” fixtures in each string have 4-pin connectors. THRU
fixtures have a gray connector shell on the input end and a black connector shell on the output end, while
LEAD fixtures have black connector shells on both ends. Care must be taken to ensure that the LEAD and THRU
fixtures are installed in the correct locations.
The jumpers between fixtures have 4-pin connectors that mate to the output and input connectors on the THRU
fixtures. A terminating cap must be plugged into the output end of the last fixture in each string. This cap seals
the last fixture in the chain. Failure to install this cap will lead to premature fixture failure due to water ingress.
Refer to your site-specific fixture layout and wiring diagram prior to installation. An example is shown below.
If you have any questions about the layout, contact G&G support prior to beginning installation.
CLEAR WATER
EXPRESS
FELIPE RAMIREZ
05/17/2023
CLEAR WATER
EXPRESS
FELIPE RAMIREZ
05/17/2023
CLEAR WATER
EXPRESS
FELIPE RAMIREZ
05/17/2023