5.0 Installation Procedure
Install the hold down bolts to secure Gamma Bracing Frame to the substrate. A
socket drive extension can be positioned through the access hole in the lower
trellis to enable the hold down bolt to be tightened.
Fully tighten the hold down bolts
Install the 12g x 40mm Tek screws in each Bracket. (Provided)
Quantity of 8 screws per bracket. (Provided)
Install the 12g x 40mm Tek screws to the Gamma Bracing Frame. Pre punched
holes are positioned in the up-right sections and the top end cap of the Gamma
Bracing Frame provided.
The Gamma Bracing Frame is now fully installed and providing its structural
performance.
6
7
8
9
10
Summary of Contents for GBF220
Page 42: ...TM GAMMA TM 42 P R O O F 15 3 Construction Details Multiple GBF Frames...
Page 43: ...TM GAMMA TM 43 P R O O F 15 4 Construction Details Concrete Floors...
Page 44: ...TM GAMMA TM 44 P R O O F 15 5 Construction Details Concrete Floors...
Page 45: ...TM GAMMA TM 45 P R O O F 15 6 Construction Details Timber Floors...
Page 46: ...TM GAMMA TM 46 P R O O F 15 7 Construction Details Timber Floors...
Page 50: ...TM GAMMA TM 50 P R O O F Notes...
Page 51: ...TM GAMMA TM 51 P R O O F Notes...