background image

 GVO  3023

GABLE ROOF SHED

3030mm wide x 2280mm deep x 1830-2025mm high

ASSEMBLY 

INSTRUCTIONS

YOU SHOULD HAVE TWO PACKAGES:

• 

1 cardboard package

• 

1 channel pack

TOOLS REQUIRED:

• 

Battery or electric drill

• 

3.3mm (1/8th inch) drill bit

• 

Pop riveter

• 

Tape measure

• 

Ladder

• 

Non-slip gloves, good 

  shoes and goggles

• 

A set of helping hands

CALL 0508 454 873

  

for an installer near you

Some parts have sharp edges and should  

be handled very carefully. We recommend  

the use of protective gloves and footwear  

when assembling. 
DO NOT attempt to erect this shed in windy 

weather. All dimensions are approximate.

PACKED BY:

Please quote this code for any 

correspondence back to the supplier

Summary of Contents for GVO 3023

Page 1: ...riveter Tape measure Ladder Non slip gloves good shoes and goggles A set of helping hands CALL 0508 454 873 for an installer near you Some parts have sharp edges and should be handled very carefully W...

Page 2: ...M Q B F J N R S C G K O D L P ASSEMBLY OVERVIEW These instructions are designed to guide you though the process of building your new garden shed It is a simple process of joining sheets together befo...

Page 3: ...t every second rib but not the corners at this stage Place the short flange of the first L flashing M on top of the rib at one end Make sure the ends are flush with the sheeting diagram 1 and put one...

Page 4: ...age for 2nd door Attach 1770mm Z door jamb to 2nd door onto the on the same side as the door plate This Z serves as a weather flashing between the doors when they are closed 150MM A J L O P N J L P L...

Page 5: ...may need to cut or bend the flange at the bottom and the top of the Z if it catches on the door jamb when opening or closing see AFTER DIAGRAM 1 BEFORE YOU WILL NEED 2 x Z Door braces Fixings Q P NARR...

Page 6: ...ts with the 3000mm channels F Use the door spacers K to make sure the door fits the gap they sit on top of the Z door jambs N see diagram 1 Drill and fix rivet or screw the channels at every second ri...

Page 7: ...he pan into the top channel of the front and the back walls 10mm more than the overhang Fix beside every second rib You will not need to worry about these fixings leaking as any water seeping through...

Page 8: ...nt or act of God including weather b The warranty shall cease and the Supplier shall thereafter in no circumstances be liable under the terms of the warranty if the workmanship is repaired altered or...

Reviews: