background image

 

Version 2, 30 August 2017, Page 

6

 of 

8

 

  

Typical Installation 

 

 

Typical Installation

 

5

Control module connections 

 

We recommended that all cabling is 
fed through 25mm conduit to make 
servicing and replacment easier.  

 

Connect the button leads to the input side 
of the control module and the solenoid 
leads to the output side. The ends of the 
leads are colour coded for easy 
identification (Blue is cold & Red is Hot).

 

 

If required more extension leads, 
please contact Galvin Specialised.

 

 

Do not cut the leads. If the leads are 
too long, it is recommended that any 
excess is coiled up and clipped to the 
wall.

 

 

6. Connect power supply and check for correct  
    operation 

 

Connect the module to the GPO, the button should 
illuminate when the power is on. 

 

When the button is pushed water should flow from 
the outlet. 

 

Note: The factory preset run time is 15 seconds, but 
it can be adjustable at any time, please contact 
Galvin Specialised.

 

 

The connection of this product to mains power 
supply should be undertaken by a competent 
person and should confirm to local Wiring 
Regulation – AS3000 Wiring rules.

 

 

 

Summary of Contents for Flowmatic Safe-Cell

Page 1: ...is a 24V AC electronic control system allowing connection of up to 5 button inputs and 5 solenoids Depending on the settings programmed the solenoids will open for a specific time once the appropriat...

Page 2: ...ange of installation types and surfaces it is important that surfaces which fixtures are mounted to are flat and free from defect This is especially important for our Flowmatic Safe Cell range where s...

Page 3: ...er wall mounted or hub mounted Outlets are not supplied and must be ordered separately Typical Installation Cut out details for face plate The stainless steel face plate assembly should be mounted flu...

Page 4: ...he wall cut out Fit the face plate to Galv Inwall box with supplied screws use supplied snake eye key If extension leads are required please contact Galvin Specialised Do not force the faceplate to fi...

Page 5: ...unting feet supplied with the control module to the back of the controller module box Measure the holes between centres as shown in pre installation page of control module dimensions Find a suitable p...

Page 6: ...ads please contact Galvin Specialised Do not cut the leads If the leads are too long it is recommended that any excess is coiled up and clipped to the wall 6 Connect power supply and check for correct...

Page 7: ...electrical connections replace solenoid valve Water or structural damage to electrical components Replace damaged electrical components Incorrect connections Check all connections Damage to sensor le...

Page 8: ...expressly and is the only warranty given by the Galvin Engineering Pty Ltd With respect to the product Galvin Engineering Pty Ltd makes no other warranties express or implied Galvin Engineering Pty Lt...

Reviews: