Version 2, 30 August 2017, Page
6
of
8
Typical Installation
Typical Installation
5
.
Control module connections
We recommended that all cabling is
fed through 25mm conduit to make
servicing and replacment easier.
Connect the button leads to the input side
of the control module and the solenoid
leads to the output side. The ends of the
leads are colour coded for easy
identification (Blue is cold & Red is Hot).
If required more extension leads,
please contact Galvin Specialised.
Do not cut the leads. If the leads are
too long, it is recommended that any
excess is coiled up and clipped to the
wall.
6. Connect power supply and check for correct
operation
Connect the module to the GPO, the button should
illuminate when the power is on.
When the button is pushed water should flow from
the outlet.
Note: The factory preset run time is 15 seconds, but
it can be adjustable at any time, please contact
Galvin Specialised.
The connection of this product to mains power
supply should be undertaken by a competent
person and should confirm to local Wiring
Regulation – AS3000 Wiring rules.