background image

 

Version 2, 30 August 2017, Page 

2

 of 

8

 

 

 

PRE - INSTALLATION

 

IMPORTANT

:  

INSTALLATION COMPLIANCE:

 Galvin Specialised products must be installed in accordance with these 

installation  instructions  and  in  accordance  with  AS/NZS  3500,  the  PCA  and  your  local  regulatory 
requirements. Water and/or electrical supply conditions must also comply to the applicable national and/or 
state standards. Failing to comply with these provisions shall void the product warranty and may affect the 
performance of the product 

(Refer supplied installation compliance sheet with the product).

 

Before proceeding with installation first check the solenoid valve supplied is suitable for the site water 
pressure and conditions. If your water pressure is outside the stated range, please contact Galvin 
Specialised. 

Ensure all supply lines are flushed thoroughly to remove debris prior to the installation of this product. A line 
strainer is supplied to protect the solenoid valve from debris.   

We recommended a thermostatic mixing valve is used to provide pre mixed water to the valve and pressure 
reduction valve may be required to comply with recommended maximum supply pressure. 

Ensure that access to the push button, solenoid valve and transformer/GPO is available for future 
maintenance when installing the components. It is recommended that isolating valves be installed upstream 
to the solenoid valve to allow for servicing. All wiring must be able to be removed when installed into 
cavities or walls, therefore, it is recommended that a minimum of 25mm conduit be used to house the 
leads. The unit is supplied with 5 meters of lead on the transformer and a 5 meters lead from the solenoid. 
Additional lead lengths may be accommodated up to a length of 5m but must be ordered separately. 

Whilst our product designs consider a broad range of installation types and surfaces, it is important that 
surfaces which fixtures are mounted to are flat and free from defect. This is especially important for our 
Flowmatic

®

 Safe-Cell

®

 range where special attention is required to minimise ligature points and areas for 

concealment of contraband. In addition to ensuring the products are fitted securely and in accordance with 
the following instructions, consideration shall be given to the use of non-pick mastics such as BASF 
Sonolastic “Ultra” to ensure a high quality and safe installation. 

Most installation problems are due to damage to the unit during installation or the selection of an 
inappropriate installation location. Select the location carefully and take care with the installation, consider 
ease of operation for the end user.

 

GENERAL INSTALLATION REQUIREMENTS 

Do not cut the wires or extended the existing leads without using a correct lead extension from Galvin 
Specialised, as this will void warranty. 

Suitable access to the service of all components must be provided. 

It is recommended that acoustic dampening products or materials be used in facilities where increased 
levels of sound protection is required. A water hammer arrestor may also be required. 

The number of valves and simultaneous demand must be considered when sizing pipes. If other fixtures 
are connected to the supply line, calculations of flow rates and pressures must be undertaken to ensure 
adequate water supply. 

Limit the number of changes of directions in pipe work.  This will result in less friction loss, better valve 
performance and reduce potential water cavitation noise. 

We recommended fitting isolating valves before solenoid for easy servicing. 

Do not apply heat near this product during connecting water line. Heat generated by soldering could 
damage plastic or electrical parts and seals, and will void the warranty.

 

For personal installation assistance and spare parts, please call our head office on 1300 514 074 and 
speak to our customer service staff.

 

Summary of Contents for Flowmatic Safe-Cell

Page 1: ...is a 24V AC electronic control system allowing connection of up to 5 button inputs and 5 solenoids Depending on the settings programmed the solenoids will open for a specific time once the appropriat...

Page 2: ...ange of installation types and surfaces it is important that surfaces which fixtures are mounted to are flat and free from defect This is especially important for our Flowmatic Safe Cell range where s...

Page 3: ...er wall mounted or hub mounted Outlets are not supplied and must be ordered separately Typical Installation Cut out details for face plate The stainless steel face plate assembly should be mounted flu...

Page 4: ...he wall cut out Fit the face plate to Galv Inwall box with supplied screws use supplied snake eye key If extension leads are required please contact Galvin Specialised Do not force the faceplate to fi...

Page 5: ...unting feet supplied with the control module to the back of the controller module box Measure the holes between centres as shown in pre installation page of control module dimensions Find a suitable p...

Page 6: ...ads please contact Galvin Specialised Do not cut the leads If the leads are too long it is recommended that any excess is coiled up and clipped to the wall 6 Connect power supply and check for correct...

Page 7: ...electrical connections replace solenoid valve Water or structural damage to electrical components Replace damaged electrical components Incorrect connections Check all connections Damage to sensor le...

Page 8: ...expressly and is the only warranty given by the Galvin Engineering Pty Ltd With respect to the product Galvin Engineering Pty Ltd makes no other warranties express or implied Galvin Engineering Pty Lt...

Reviews: