![background image](http://html1.mh-extra.com/html/galaxy/1m2s/1m2s_wiring-and-programming-manual_3219236013.webp)
of the Magnetic Limit Switch. Note that the mounting bracket is designed to allow for some adjustment once the
optimal location is identified and the bracket is secured with screws.
4.
The next step will be to connect the Wired Component to the control board in the control box. Remove the four
screws that secure the gel pad to the control box. BE CAREFUL The connector and ribbon are fragile and will be
very difficult to successfully reattach. The Gel pad can be placed in the side of the control box while attaching
the wires for the magnetic limit switch (see figure 15).
5.
For reference, the figure 16 below show the Control Board, CB, outside the control box. Figure 15 shows the CB
installed inside the control box. There are 3 wires (red, green, black) coming from the middle edge of the control
board. These wires are called the “limit wires.” They connect to the M
agnetic Limit Switches. The other ends of
these wires are joined together with a blue wire nut which can be removed. The black wire is the common, the
red is for the Top Mag switch wire, and the green is for the Bottom Mag switch wire.
Figure 12. Two-sided tape on the
bracket
Figure 13. Bracket tapped to the back
of the travel beam
Figure 14. Mounted wired component
to the mounting bracket
Figure 16. Control board
or “CB”
Figure 15. Gel Pad Placed in the side of the control box
Summary of Contents for 1M2S
Page 1: ...1M2S Control Box Wiring Programming Guide...
Page 5: ......
Page 6: ...240 Volt standard Lift Wiring...
Page 8: ...120 Volt Standard Lift Wiring...
Page 11: ......
Page 14: ...Limits CB...
Page 16: ...Additional Equipment Setup Section Not Standard Call Send...
Page 20: ......