![Galanz XQG80-Q812DE After-Sales Service Manual Download Page 44](http://html1.mh-extra.com/html/galanz/xqg80-q812de/xqg80-q812de_after-sales-service-manual_3245530044.webp)
XYJGT80QFSDE-001
43
1.
用平口钳夹紧图一所
示管夹同时拔出排气软
管
2.
拔出图二所示进水软
管
3.
拔出图三所示两个进
水阀接线端子
4.
用十字批拆除图四所
示两个进水阀固定螺
钉,取出进水斗组件
1.Pull out the exhaust
hose and clamp the
clamp as shown in
figure 1 with
combination pliers
2.
Pull out the exhaust
hose as shown in
figure 2
3.
Pull out the two inlet
valve terminals as
shown in figure 3.
4.
Remove the two
feed valve setting
screws as shown in
figure 4 with a cross
screwdriver and
remove the
inlet
housing as
1.
注意原机器上进水阀
接线端子的顺序,重装
时不要接反,否则可能
会出现功能异常
1.Pay attention to the
sequence of inlet valve
terminals on the
original machine, and
do not connect them
reversely when
reassembling,
otherwise abnormal
functions may be
caused .
平口钳
combin
ation
pliers
十字批
cross
screwdriver
使用工具
using tools
图一
fig.1
排气软管
Exhaust Hose
图二
fig.2
进水软管
Exhaust Hose
图四
fig.4
进水阀
Inlet Valve
图三
fig.3
进水阀
Inlet Valve