GPS 2300 PFC BI-PULSE
7
3. START-UP. OPERATION AND ADJUSTMENT CONTROLS.
3.1. OPERATION CONTROLS.
A
Controls and displays of synergic control.
B
Euro-connector.
MIG and TIG welding torches connection.
C
Negative pole.
F
Positive pole.
J
Gas inlet hose.
H
Power supply cable.
G
O/I
Master switch
ON / OFF
M
Adjustment lever
of wire driving
pressure.
N
Change of polarity.
Positive terminal and negative terminal.
K
Drive motor
I
Connector for electrical connection of the Cooling Module
L
Support axle for wire reel 15 kg. Rotation pressure control.
The rotation resistance can be adjusted by means of the central pressure system.
1
2
3
5
4
C
F
H
J
A
B
N
K
M
L
G
I
Summary of Contents for GPS 2300 PFC BI-PULSE
Page 36: ...GPS 2300 PFC BI PULSE 36 NOTES...
Page 42: ......