background image

Talano & Alera Installation v2.6 

Fitting Instructions

 

 

 

 

 

 

Figure 5.2  

Imperative base plate fixing locations. Note - Sleeves will not grip unless the hole is cleaned out first. Table   
details fixings for foot plate end of bath. Ensure washer is placed between Fischer screw head and foot plate to 
protect the painted surface. 
 
 

 

 

 
  

 

 
Seat 
post  

Head end of bath 

– Right Hand Shown 

IMPERATIVE - A

 

IMPERATIVE - 

Figure 5.0

 

6) Place the bath into its final location and fix it to the floor. Use a spirit level to ensure the foot 
plate is vertical in both planes.  This is the most common cause of issues with incorrect 
installation. Use shims if required. 

 

 

Description

 

Qty

 

Floor Type

 

M8 x 60 Hex Head Coach Screw

 

4

 

Concrete/Composite

 

M8 x 40 Hex Head Coach Screw

 

4

 

Wood/Floorboard

 

M10 x 50 Nylon Plug Type E

 

4

 

 

 

M8 Form C Washer - BZP

 

4

 

 

 

Figure 5.1

 

4) With the bath in position, mark the floor where it is to be drilled. See Figures 4.1 & 4.2 for 
dimensional information. A ‘Top Hat’ foot clamp bracket will secure the bath at the ‘tap end’ of the 
bath. Position the bracket (Figure 5.1) in the location identified in figure 4.1. Mark the floor fixing 
locations. For the alternate hand, fit the bracket around the opposite foot. Remove the bath from 
the working area.    
  
5) Drill the marked fixing holes, taking into account the type of screws that will be used (see Figure 
5.2). Ensure that holes are drilled into solid flooring, and clean out all dust and debris.  
 
Holes marked in Red with ‘

IMPERATIVE - A

’ must have a firm fixing made to the floor. These 

fixings are the opposite side of the seat and carry the load. The hole marked 

IMPERATIVE 

– B

 

should also be fixed to the floor to ensure the bath is firmly held down. 

Figure 4.2  

Summary of Contents for TALANO

Page 1: ...lation v2 6 Gainsborough Bathrooms Gainsborough House Brickyard Road Aldridge WS9 8SR United Kingdom Tel 44 0 1527 400022 email service gainsboroughbaths com www gainsboroughbaths com TALANO ALERA INS...

Page 2: ...ll floor finishes should be in place prior to installation i e Altro Tiling Items supplied with the Bath Installation manual User manual Bath unit bath shell support frame control pack Bath surround p...

Page 3: ...th to floor Feet frames MUST be level and vertical Use a spirit level Utilise shims if required Connect bath to temporary power supply Connect handset and power up bath Place bath into position Connec...

Page 4: ...acity 230 200 litres Approximate Bath Weight Empty 119Kg 115Kg Power Supply Mains 230V to be supplied via 30mA RCD Operating Voltage 24V Battery Backup Yes Water Supply Hot Cold water at 1 bar minimum...

Page 5: ...ximum Water Capacity 230 200 litres Approximate Bath Weight Empty 130Kg 125Kg Power Supply Mains 230V to be supplied via 30mA RCD Operating Voltage 24V Battery Backup Yes Water Supply Hot Cold water a...

Page 6: ...cing see figure 4 0 for further details 2 Offer the bath into position making sure that the floor is of a sound solid surface If the floor slopes i e wet room installation with a centre drain shims sh...

Page 7: ...Wood Floorboard M10 x 50 Nylon Plug Type E 4 M8 Form C Washer BZP 4 Figure 5 1 4 With the bath in position mark the floor where it is to be drilled See Figures 4 1 4 2 for dimensional information A T...

Page 8: ...plicable junction boxes should be fitted underneath the bath and affixed using a mechanical tool screw or similar Ensure that a suitable location is chosen i e positioned off the floor and behind bath...

Page 9: ...thickness Once fitted the side panel can be clipped into position Further work may be required before the end panels can be fitted see step 12 Figure 7 0 Affix wooden battens to the floor to prevent...

Page 10: ...on Addendum Head End Base Plate Figure 7 0 Please take note of the floor fixing locations illustrated on the base plate diagram Precautions should be taken to investigate floor integrity paying partic...

Page 11: ...Talano Alera Installation v2 6 11 Installation Addendum...

Page 12: ...Talano Alera Installation v2 6 12 Installation Addendum...

Page 13: ...the bath and will then stop Press Seat out which will bring the seat down and out do not use until the fault is rectified Once power is restored allow the batteries to recharge before operation usuall...

Reviews: