IMPORTANT INFORMATION

Be aware toughened glass can shatter if not handled correctly. It should not 

be subjected to any sharp impact and it is essential to protect the glass by 

resting it on a soft protective surface during installation such as cardboard 

or carpeting. It is recommended to wear PPE at all times during installation.

Component Check List: Supplied

Description

Quantity

Wall Profile

1

Fixed Panel

1

Moving Panel

1

Deflector

1

Fixing Kit Components

Description

Quantity

2.5mm Drill Bit

1

9mm Screws

3

40mm Screws

3

Screw Bases

3

Cover Caps

3

Universal Cap

1

Wall Plugs (for brick and block only)

3

Branding Badge (where applicable)

1

4mm Allen Key

1

Equipment Check List: Not Supplied

Description

Electric / Battery Drill
6mm Masonry Drill Bit
Bathroom Sealant Gun
Bathroom Sealant
Screwdriver
Spirit Level
Tape Measure
Pencil
Wall Plugs (not supplied)
Stanley Knife / Snips

Please make sure the purchaser/end user 

completes and returns the guarantee card 

which is enclosed with this product.  Failure 

to validate the Guarantee will mean only the 1 

Year Statutory Guarantee will apply.

CONSUMER GUARANTEE

PRE-INSTALLATION CHECKS

1.  Check you have the correct product.  Please look at the labels on the side of the product packaging.

2.  Check all the product components are in the box and the fixing kits.

3.  Unpack your product and handle it with care.

4.  Please check the product for defects or damage. once the installation has commenced we cannot accept responsibility for any defects or damage.

5.  Please take time to read these instructions prior to installing your product.

6.  Before you commence any drilling check there are no hidden electrical cables and/or water cables.

7.  No attempt should be made to re-work the toughened safety glass.

8.  The installation of the product should be performed by two persons.

9.  It is strongly recommended that the walls the product is going to be installed on are vertical.

10.  It is strongly recommended the product is fitted on a tiled surface or similar waterproof surface.

11.  It is strongly recommended the walls are tiled and grouted before the product is installed.

12.  If the walls and/or the tray are not level you will not achieve maximum adjustment of the product.

13.  Pictures used are for illustration purposes only, product designs may alter slightly as a result of continuing product development.

14.  We do not stipulate where the European Standard Kite Mark should be positioned on the glass when being factory assembled.

15.  Please note that some natural misting may occur when you remove this product from its packaging, due to the addition of the glass protection pre-

coating. If this does occur this can easily be removed with a soft, dry cloth.

          Ref: V8BV- Rev.5 SEPT 2019

Summary of Contents for V8BV13

Page 1: ...ging 2 Check all the product components are in the box and the fixing kits 3 Unpack your product and handle it with care 4 Please check the product for defects or damage once the installation has commenced we cannot accept responsibility for any defects or damage 5 Please take time to read these instructions prior to installing your product 6 Before you commence any drilling check there are no hid...

Page 2: ...al the bath along the tiled wall with a bathroom sealant not supplied 6 With the water still in the bath leave the sealant to cure for at least 24 hours Spray the seal and joints with the shower head and check for leaks when the silicon has cured Check the plumbing for leaks Do not plasterboard over the bath Do not grout the tiles when the bath screen has been fitted the grout may discolour the al...

Page 3: ... Wall Profile in Step 2 You must ensure the glass runs parallel to the outside edge of the bath before marking the Bath Top You will need help to hold the screen in position while you mark the tiled wall and bath top IMPORTANT INFORMATION Failure to fit the fixed panel to the inside edge of the bath top will result in the bath screen leaking and will not be covered under the terms of the guarantee...

Page 4: ...push the wall plugs supplied into the drilled holes 6 Apply a bead of sealant the width of the Wall Profile at the bottom where the Wall Profile meets the tiled wall 7 Screw fix the wall profile to the wall using the 40mm screws supplied ensuring it is vertical 8 Apply a bead of sealant to the inside of the Wall Profile at the bottom where it meets the Bath top IMPORTANT The Wall Profile must be c...

Page 5: ...etely vertical and it is sitting down on top of the bath and is also parallel to the outside edge 4 Drill three holes through the Fixed Panel into the Wall Profile with the 2 5mm drill bit supplied Ensure the Fixed Panel is sitting fully down on top of the bath and is completely vertical 5 Place the bases onto the 9mm screws and screw fix the Panel to the Wall Profile Fit the Cover Caps You will n...

Page 6: ...ring area and the Round Face to the outside 3 Offer the Moveable Panel onto the bottom Pivot Assembly then reattached the top Pivot Assembly so the panel is then secured into position 4 With the deflector facing inward push the Bottom Seal up onto the bottom of the Moveable Panel and also along until it butts up against the aluminium profile trim to length if required Please take care when cutting...

Page 7: ...can be shortened by snapping off at these points adding a small amount of sealant will help keep the cap in place 4 Fit the Deflector to the bottom ensure it is fitted with the deflector part facing inward towards the bath Push the Deflector up to the aluminium then trim the to length as required NOTE The Deflector is fitted to enable the water to be deflected back into the bath 5 Please allow 24 ...

Page 8: ...ixed Panel Assembly 1 13 23 4 Pivot Assembly Top 1 14 24 5 Linear Seal 1 15 25 6 Tube Cap Right Hand 1 16 7 Moving Panel Assembly 1 17 8 Pivot Assembly Bottom 1 18 9 Tube Cap Left Hand 1 19 10 Deflector 1 20 If you need to replace any damaged parts please see illustration below for parts list then call Customer Relations on 01325 328033 ...

Page 9: ...ew Clean your product using a mild detergent diluted in water and then polished off using a soft cloth If you live in a hard water area periodically clean your product using a 50 50 solution of white vinegar and water The solution should be left on the enclosure for approximately 5 minutes then rinsed off using warm water This method of cleaning should remove lime scale residue Simple Maintenance ...