28
44444
INST
INST
INST
INST
INSTALLA
ALLA
ALLA
ALLA
ALLATION 4
TION 4
TION 4
TION 4
TION 4
Fig. 4-6a Typical Dualstream Connections
Domestic Hot Water
22mm
Fit 22mm ball valve - supplied
Domestic Cold Water
22mm
Fit 22mm ball valve - supplied
Mains supply
22mm
Fit 22mm ball valve - supplied
Tundish
-
Discharge to be arranged and sized
to comply with Building Regulations.
Boiler Flow
22mm
Indirect only
22 x ¾ M.I. Coupler - supplied
Fit Motorised Valve - supplied
Boiler Return
22mm
Indirect only
22 x ¾ M.I. Coupler - supplied
4-6.3 Connections to Dualstream - 125, 150, 210 and 300 Cylinders
DOMESTIC
HOT WATER
22mm
FROM
MAINS
22mm
DHW
SECONDARY
DOMESTIC
HOT WATER
(PLUGGED)
TUNDISH
DISCHARGE
BOILER
FLOW
22mm
COLD INTO CYLINDER
TO ACCUMULATOR 22mm
ACCUMULATOR
COMBINATION
VALVE
HTPV
VALVE
CYLINDER
DRAIN COCK
ACCUMULATOR DRAIN COCK TO BE FITTED
DOMESTIC
COLD WATER
22mm
BOILER
RETURN
22mm
CYLINDER
THERMOSTAT
UNVENTED
CYLINDER
MOTORISED
VALVE
44444