20
Figure 4.7: [Front view] Lifting up the upper radome and fix by threaded bolts.
Figure 4.8: [Side view] This scaffold side is for removing the upper radome
Service engineer
Upper radome
Height = 1650
(mm)
(mm)
Standing position of
scaffold when lifting up
the upper radome
Required height when
lifting up the upper
radome
Height is different
as Figure 4.5
It recommends 400mm depth if using storable type because
when it exceeds 400 mm, it becomes heavy and hard to store.
Otherwise use 600mm depth to fix scaffold.
Height = 1650