![Furuno FMD-3200 Installation Manual Download Page 12](http://html1.mh-extra.com/html/furuno/fmd-3200/fmd-3200_installation-manual_2350123012.webp)
1. MOUNTING
1-2
• Make sure that the ground wire is
connected between the earth termi-
nal on the chassis and the ship’s
earth.
• Fasten the USB cable with the cable
tie (supplied) to the cable routing
peg.
1.2.1
Desktop Mounting
Fixing with KB fixing metal
1. Fix the KB fixing metal to the bottom of the control unit.
2. Fix the unit with self-tapping screws (5x20, local supply).
Fixing without KB fixing metal
1. Drill four mounting holes of 5 mm (RCU-024) or 4 mm (RCU-026) diameter refer-
ring to the outline drawing at the back of this manual.
2. Fix the control unit with four screws (RCU-024: M4, RCU-026: M3) from under
side of the desktop. (The M4 screws with a sufficient length for the thickness of
the desktop should be provided locally.)
USB cable
Ex. ECDIS control unit, bottom view
Cable tie
Cable routing peg
KB fixing metal
RCU-026
RCU-024
RCU-026
RCU-025
Summary of Contents for FMD-3200
Page 20: ...1 MOUNTING 1 10 This page is intentionally left blank...
Page 70: ...3 ECN 303 304 OPTION 3 8 This page is intentionally left blank...
Page 72: ...4 SETTING UP THE EQUIPMENT 4 2 This page is intentionally left blank...
Page 120: ...D 1 29 Nov 2017 H MAKI 29 Nov 2017 H MAKI...
Page 121: ...D 2 29 Nov 2017 H MAKI 29 Nov 2017 H MAKI...
Page 122: ......
Page 123: ......
Page 124: ...1RY 1 6 0...
Page 125: ...11 Jan 2018 H MAKI 11 Jan 2018 H MAKI...
Page 126: ...11 Jan 2018 H MAKI 11 Jan 2018 H MAKI...
Page 127: ...11 Jan 2018 H MAKI 11 Jan 2018 H MAKI...
Page 128: ...D 9 14 Jun 2018 H MAKI...
Page 129: ...D 10 14 Jun 2018 H MAKI...
Page 130: ...D 11 14 Jun 2018 H MAKI...
Page 133: ...13 Jan 2012 Y NISHIYAMA...
Page 134: ...13 Jan 2012 Y NISHIYAMA...
Page 135: ...D 16 8 Jun 2018 H MAKI...
Page 136: ...D 17 22 Aug 2019 H MAKI...
Page 137: ...D 18 6 Apr 2021 H MAKI...
Page 138: ...D 19 6 Apr 2021 H MAKI...
Page 139: ...D 20 6 Feb 2020 H MAKI...