![Furuno FCV-38 Installation Manual Download Page 1](http://html1.mh-extra.com/html/furuno/fcv-38/fcv-38_installation-manual_2349640001.webp)
www.furuno.com
All brand and product names are trademarks, registered trademarks or service marks of their respective holders.
Installation Manual
Stabilized FISH SIZE INDICATOR
Model
FCV-38
(Product Name: FISH FINDER)
SAFETY INSTRUCTIONS ................................................................................................ i
SYSTEM CONFIGURATIONS........................................................................................ iii
EQUIPMENT LISTS........................................................................................................ iv
1.1 Processor Unit ...................................................................................................................1-1
1.2 Transceiver Unit.................................................................................................................1-3
1.3 Trackball Control Unit ........................................................................................................1-4
1.4 Transducer.........................................................................................................................1-7
1.5 Junction Box (Option) ......................................................................................................1-10
1.6 DVI/USB Repeater (Option).............................................................................................1-10
2.1 Processor unit ....................................................................................................................2-2
2.2 Transceiver Unit.................................................................................................................2-6
2.3 Trackball Control Unit ........................................................................................................2-8
2.4 Transducer.......................................................................................................................2-10
2.5 Junction Box (option) .......................................................................................................2-11
2.6 DVI/USB Repeater (Option).............................................................................................2-13
2.7 Input/Output Sentences (NMEA0183) .............................................................................2-14
3.1 How to Set the Language and Measurement Unit .............................................................3-1
3.2 How to Set the [Service] Menu ..........................................................................................3-2
3.3 Communication Port Setting ..............................................................................................3-7
3.4 External Echo Sounder Setting........................................................................................3-10
3.5 Calibration Setting............................................................................................................3-12
3.6 Stabilization Setting .........................................................................................................3-16
3.7 How to Take a Still Image of the RX Monitor ...................................................................3-19
3.8 Reset to Default Setting ...................................................................................................3-19
3.9 Retrofit from FCV-30........................................................................................................3-20
Summary of Contents for FCV-38
Page 8: ...EQUIPMENT LISTS vi This page is intentionally left blank ...
Page 58: ...3 INITIAL SETTINGS 3 24 This page is intentionally left blank ...
Page 66: ...D 1 9 Sep 2019 H MAKI ...
Page 67: ...D 2 3 Aug 2020 H MAKI ...
Page 68: ...D 3 3 Oct 2019 H MAKI ...
Page 69: ...D 4 26 Sep 2019 H MAKI ...
Page 70: ...D 5 14 Jun 2018 H MAKI ...
Page 71: ...D 6 14 Jun 2018 H MAKI ...
Page 72: ...D 7 14 Jun 2018 H MAKI ...
Page 73: ...D 8 Jun 10 05 ...
Page 74: ...D 9 ...
Page 75: ...Oct 22 07 R Esumi D 10 ...
Page 76: ...D 11 9 Oct 2019 H MAKI ...
Page 77: ...D 12 9 Oct 2019 H MAKI ...
Page 78: ...D 13 11 Mar 2010 Y NISHIYAMA ...
Page 79: ...D 14 15 Apr 2020 H MAKI ...