Installation Procedure
*Unpack furnace from crate and store in dry area. The furnace usually
has timber supports installed inside for transport. Remove before
operation.
*Remove Furnace Manual from inside of furnace chamber.
*Furnace requires a min of 1 metre space around it to carry out main-
tenance / repairs.
*Install fuel supply. This must be carried out by a qualified technical
person. Refer to furnace gas requirements to size inlet line correctly.
*For door operation air is required to run the pneumatics. Connect air
supply to the filter on the furnace.
*Electrical box is fitted with 3 core flex. If power socket is available
connect correct type plug and turn on. If not then an electrician is to
either install correct socket or hard wire furnace to power supply.
*NOTE THIS FURNACE USES SINGLE PHASE POWER WITH A
NEUTRAL WIRE AND EARTH.
*BEFORE STARTING CHECK THAT ALL EXHAUST DUCTING IS IN
PLACE.