ABN: 68 606 541 468 Email: [email protected] 20
Commissioning Procedure
1. Turn gas on slowly
2. Check for leaks (use soapy water)
3. Check supply pressure (140KPA)
4. Open Furnace Door
5. Turn power on and make sure furnace is set to Low fire.
(Toggle switches located on front of electrical box)
Amp Meter
On/Off Switch
High/Low Switch
Temperature Controller
Alarm Light