
2 - INSTALLATION
© Fulton 2018
2-24
VSRT_IOM_2018-1213
VIEW1
SURFACE BLOWDOWN
DRAIN
FAST OPENING
VALVE
BLOWDOWN
VALVE
SHUT OFF
VALVE
CHECK
VALVE
STACK
TEE FOR CHEMICAL
QUILL INJECTION
CHECK
VALVE
SHUT OFF
VALVE
MAKEUP
WATER
SUPPLY
SIGHT
GLASS
CONDENSATE
RETURNS
VENT TO
ATMOSPHERE
OVERFLOW
FEED TANK
DRAIN
THERMOMETER
COOLING WATER
INLET
THERMOMETER
SYSTEM DRAIN
VENT TO
ATMOSPHERE
COOLING WATER INLET
FOR LOW LEVEL DRAIN
THROTTLING
GLOBE
VALVE
BLOWDOWN TANK
DRAIN
LOW LEVEL DRAIN
FEEDWATER PUMP
FEEDWATER
TANK
BLOWDOWN
TANK
STEAM PREHEAT
CONNECTION
SURFACE BLOWDOWN
GAS INLET
STEAM SAMPLE
PORT / VENT
WATER SAMPLE
PORT
TUBING FOR SIGHT
GLASS DRAIN
30" OR
5 PIPE DIAMETERS
WHICHEVER
IS GREATER
STEAM OUTLET VALVE
SAFETY RELIEF VALVE
HIGH WATER OVERFLOW CONNECTION
PUMP DISCHARGE
GAUGE RECOMMENDED
G-17-100003.2
Figure 13 - Near Boiler Piping (continued from previous page)