
Questions? Call (315) 298-5121, or visit us online at www.fulton.com
SECTION 3
FBW-IOM-2014-0311
OPERATION
3-3
!
WARNING
Never attempt to operate a boiler
that has failed to pass safety checks.
4
CAUTION
Please read these instructions and
post in an appropriate place near the
equipment. Maintain in good legible
condition.
The element sequencer will energize/de-energize elements in sequence to
maintain outlet temperature.
Circulating Pump Switch (if supplied with the boiler)
The fused switch that controls the circulating pump should be kept in the
“on” position at all times during the boiler operation as well as during the non-
operating period of the boiler. This should be turned “off ” only when repairs or
adjustments should be made.
Thermostat (optional)
An element thermostat may be supplied with your boiler. The thermostat is
located on one of the heating elements and is preset from the factory. This
should not be readjusted without consulting factory or your local Fulton
representative.
A
B
C
D
E
FIGURE 2 - PANEL BOX (EXTERIOR)
Legend:
A Runtime Meter (optional)
B. Alarm Horn
C. Temperature Controller
D. Various Lights/Alarms
E. Multimeter