Ref / Pt.No: 006944
Revolution II Stage 3 Installation
Instruction
Revision: C
Date: 27-Nov-12
006944.doc
Page 20 of 29
Drill a 27mm hole in the Dry Vacuum Line, secure the valve clamp assembly over it. The
installation guide of the vacuum line can be found in the stage 4 manual.
035515