
Slide the wire guide tool through the FD
routing hole into the seat tube.
Connect the FD wire and pull up through
the seat tube.
Bottom Bracket and Crankset mounting
For BB and crankset mounting, check the dedicated FSA instructions.
5. Drivetrain Installation
Before assembling the drivetrain, install Front Derailleur (FD) and Rear Derailleur (RD) wires. WE wires are
compatible with industry standard internal wire routing.
FD Installation
Install the front derailleur on frame
braze-on using supplied.
Adjust the derailleur height so the
gap between outer cage and large
chainring is 1 to 3 mm. See image
3
End of sentence in point 1. Snug
the bolt enough to hold derailleur
in position.
When gap is set, rotate the
derailleur so the cage position is
parallel with the chainrings. See
image 4
When derailleur position is correct,
tighten the derailleur bolt to 5-7
Nm.
1
2
3
4
5
FD Wire Routing