10.2.4 Final
Steps
1.
Update
HCP
firmware.
See
"
2.
From
the
Web
GUI,
configure
chassis
replacement
in
maintenance
mode.
If
maintenance
mode
is
set,
go
to
the
next
step.
See
"
."
3.
Confirm
startup.
Start
the
node
from
the
power
button
on
the
operation
panel.
4.
Check
the
I/O
configuration.
5.
Turn
off
the
power.
Stop
all
nodes
by
long-pressing
the
power
button
on
the
operation
panel.
6.
Clear
maintenance
mode.
Chapter
10
BAREBONE
(Barebones
Server)
C120-0090-04EN
10.2
Replacing
the
BAREBONE
66
Summary of Contents for Supercomputer PRIMEHPC FX700
Page 105: ......