![Fujitsu Supercomputer PRIMEHPC FX700 Upgrade And Maintenance Manual Download Page 23](http://html.mh-extra.com/html/fujitsu/supercomputer-primehpc-fx700/supercomputer-primehpc-fx700_upgrade-and-maintenance-manual_118633023.webp)
Table
1.2
Parts
Handled
as
Field
Replaceable
Units
(continued)
Part
Name
BAREBONE
(barebones
server)
BMCIFU
Table
1.3
Parts
Handled
as
Upgrade
Parts
Part
Name
PSU
(power
supply
unit)
CMU
(blade)
InfiniBand
card
M.2
SSD
Only
Fujitsu
service
personnel
and
Fujitsu-trained
technicians
are
capable
of
performing
installation
procedures
related
to
these
units.
Please
be
aware
that
illegally
tampering
with
the
system
voids
the
warranty
and
exempts
the
manufacturer
from
liability.
Table
1.4
Work
Time
Calculation
Step
Included?
Description
Shut
down
FX700
main
unit
No
The
shutdown
time
varies
greatly
depending
on
the
hardware
and
software
configurations.
Remove
from
rack
and
disassemble
Yes
To
be
able
to
do
the
work,
remove
the
FX700
main
unit
from
the
rack
(when
applicable).
Transport
(Carry)
No
The
work
of
moving
the
FX700
main
unit
to
a
workbench
(as
required)
varies
depending
on
the
environment.
Maintenance
work
Yes
Perform
maintenance
work,
including
software
preparation
and
post-work
operations.
Assemble
and
mount
in
rack
Yes
Assemble
the
FX700
main
unit
and
return
it
to
the
rack
(when
applicable).
1.1.3
Upgrade
and
Repair
Unit
(URU)
Upgrade
and
repair
parts
do
not
support
hot
plugging,
and
customers
can
order
them
separately
to
mount
them
as
options.
1.2
Work
Time
The
approximate
work
time
shown
for
each
work
procedure
includes
the
time
required
for
preliminary
work.
See
the
following
table
for
the
steps
included
in
the
work
times.
Chapter
1
Preliminary
Work
C120-0090-04EN
1.2
Work
Time
2
Summary of Contents for Supercomputer PRIMEHPC FX700
Page 105: ......