78
Operating Manual
TX2540 M1
Starting up and operation
Ê
Follow the on-screen instructions (see also section
"Configuring the
server and installing the operating system with the ServerView
Installation Manager" on page 82
or section
"Configuring the server and
installing the operating system without the ServerView Installation
Manager" on page 83
).
–
System already installed
:
Ê
Press the On/Off button.
The server is switched on, performs a system test and boots the
operating system.
I
In the case of configurations with a large memory size, the boot
process may be prolonged and the screen may remain dark for
several minutes.
Switching the server off
The Power-on indicator (see figure
8 on page 66
) lights up green.
Ê
Shut down the operating system properly.
The server is switched off automatically and enters standby mode. The power-
on indicator lights up orange.
I
If the operating system does not switch off the server automatically, press
the On/Off button for at least four seconds and/or send a corresponding
control signal for power button override.
Other On/Off options
Besides the On/Off button, the server can be switched ON and OFF in the
following ways:
–
Timer-controlled switch-on/off
Using the ServerView Operations Manager or iRMC S4, you can configure
that the server is switched on/off controlled by an internal timer.
–
Ring indicator
The server is switched on by an internal or external modem.
–
Wake up On LAN (WOL)
The server is switched on by a command via the LAN (Magic Packet™).
–
After power failure
Summary of Contents for PRIMERGY TX2540 M1
Page 6: ...Operating Manual TX2540 M1 ...
Page 10: ...Operating Manual TX2540 M1 Contents ...
Page 14: ...14 Operating Manual TX2540 M1 Introduction ...
Page 34: ...34 Operating Manual TX2540 M1 Functional overview ...
Page 62: ...62 Operating Manual TX2540 M1 Hardware installation ...
Page 86: ...86 Operating Manual TX2540 M1 Property and data protection ...