TX200 S5
Options Guide
21
4
Preparation
V
CAUTION!
Follow the safety instructions in the
chapter “Safety instructions”
.
4.1
Floorstand model
4.1.1
Opening the server
Ê
Terminate all applications and shut down the server correctly.
Ê
If your operating system has not switched off the server, press the on/off
button.
Ê
Pull all power connectors out of the power outlets.
Ê
Unlock the server and remove the key.
Figure 2: Opening the server
Ê
Pull the locking lever as far as it will go (1). This pushes the side cover
backward (2).
Ê
Remove the side cover (3).
/
0
1